Laserfiche WebLink
52. STORMWATER POLLUTION PREVENTION PLAN: The applicant shall submit one hard copy <br /> and one PDF copy of the Stormwater Pollution Prevention Plan (SWPPP) for review and <br /> acceptance by the Director of Engineering/City Engineer prior to issuance of a building or <br /> engineering permit, whichever occurs first. A hard copy of the City-accepted SWPPP shall be <br /> available at the project site until all work is complete and engineering and building permits have <br /> been finaled. A site specific SWPPP shall be combined with proper and timely installation of the <br /> Best Management Practices, thorough and frequent inspections, maintenance, and <br /> documentation. Failure to comply with the reviewed construction SWPPP may result in issuance <br /> of correction notices, citations, or a stop work order. <br /> 53. LANDSCAPE PLAN: The Landscape plan submitted for issuance of a building permit shall show <br /> planting within the bioretention area as per Alameda County C3 Stormwater Technical Guidance <br /> V5.1 dated May 2, 2016, Appendix B- Plant List & Planting Guidance. (PROJECT SPECIFIC <br /> CONDITION) <br /> 54. BIORETENTION: The project Geotechnical Engineer shall review and approve the location of the <br /> bioretention area on the downstream of the house. The bioretention area may require a structural <br /> wall with the exposed wall finish subject to the review and approval of the Planning Division. <br /> (PROJECT SPECIFIC CONDITION) <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and fire <br /> hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation of the on- <br /> site fire mains and fire hydrants. Specific installation drawings submitted by the licensed underground fire <br /> protection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> 55. TURN-AROUND: The on-site Fire Department turn-around is required and cannot be modified <br /> from the approved plans without prior approval from the Fire Department. (PROJECT SPECIFIC <br /> CONDITION) <br /> 56. FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 57. FIRE CODE: All construction shall conform to the requirements of the 2016 Pleasanton Fire <br /> Code and local ordinances. All required permits shall be obtained prior to work commencement. <br /> 58. SITE SAFETY: Site safety during construction shall be in accordance with Fire Code chapter 33. <br /> 59. FIRE SPRINKLERS: Automatic fire sprinklers shall be installed in all occupancies in accordance <br /> with the 2016 Pleasanton Building, Fire and Residential Codes with local amendments and <br /> ordinances. <br /> 60. HAZARDOUS MATERIALS: Should any operation or business activity involve the use, storage or <br /> handling of hazardous materials, the firm shall be responsible for contacting the Livermore- <br /> Pleasanton Fire Department prior to commencing operations. Please contact the Hazardous <br /> Materials Coordinator at 925/454-2361. <br /> P19-0059 Planning Commission <br /> Page 9of12 <br />r the State of <br /> California Construction General Permit to the Engineering Department prior to the approval of the <br /> improvement plans by the Director of Engineering/City Engineer. <br /> P19-0059 Planning Commission <br /> Page 8 of 12 <br />on Services District <br /> (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> P19-0059 Planning Commission <br /> Page 6 of 12 <br />neer; <br /> b. Show construction vehicles and equipment parking area, materials storage, temporary <br /> fencing, construction trailer location, and construction contractors/workers parking <br /> area. <br /> P19-0059 Planning Commission <br /> Page 5of12 <br />-0059 Planning Commission <br /> Page 4 of 12 <br /> LUXti11 a I.L - <br /> �[ ,443_1:8,,...i1,...'3'--,14445.5-41'0-11_14.22: . ' <br /> ry" 0 �1 202- F�:. �,� P 43017 AI i l)43! 1, ,406! 11.410r411:051_13121-14_4814511 <br /> � 145 ,423 i _�1533 1h`� <br /> t• m 3 R A L� .. .. _ 1 t / - ,4� 1-- �]4`Y9_+1 1418 1411i1-Q <br /> ,r. F 'v 2oas } ?' r ( v S I a -T 1 14011 �.J45, i 1414 1415 1535:.:,1527 1 1 <br /> l�I I I 1 it :;f':).i''.407 1520 <br /> ,.4 �� 1 1.148 �, 1515 1x45' <br /> VALLEY A V ' itr,� D I '� 512 505 <br /> W 993 _ '� .a / , e s`' 1193 <br /> $+_ _ <br /> 1993 ,. 1 - 1 6 \ a g <br /> Wy ,93 a ' <br /> ,95, RROU!<:1>;IZCF��ti'rY - kTII � M \ 1795 \'797 <br /> yl 1a1/ 1944 <br /> e <br /> b 1787 v <br /> • ISI i� <br /> 939 . - j_____IL".:::::i <br /> e ,,� �,� <br /> w• 1965 1952 J \ _ 18gi ,alli3 '�, °n <br /> n <br /> ,92. ''4 <br /> „e01 <br /> glaY16.8 �,—� J I ” 0 1 <br /> 83q a i <br /> 1863 ry , _, ..J <br /> �iliY.tSchool Q ,90+ -„ ,860.,:-'� ,ems ,�� ^< !� "".� m 1.183 � 3� _ 1734 1638 ,1544 1536 15 <br /> 8x9 ,s„ m '924 <br /> t ,62 <br /> 1265 1 <br /> 44 <br /> m <br /> ,sea =�=J_ I <br /> . <br /> 1 ' <br /> 976 m i 5 , laoe i ,Y U I Et 8 <br /> 979 e ` <br /> ,961 1614 r.,, ,-44 N +947 J � 11 - - <br /> a + <br /> C ice <br /> I 1 I�I \ ��. ��N( I.w�U Si <br /> ,8315 15,0 ,®7 ,926 � 19215 1967 } 1554 i � <br /> 1 311 <br /> — 51,1171 <br /> '4 '14p RAN <br /> 5y�� a q ty <br /> 1885 180' 1805 1606 1841 1995 i 1992 J v : 17 A �1 b w' 'd1 ' a "' €y 7n R <br /> MSS` 2 1 `" <br /> . :id_AmLL)A I)u - 1 ' S: ei - 4 'iA 9 c/1 <br /> m 8 4 <br /> �)� .'- W 1495 1198 ,795 :66 <br /> ,789116991800 = 4 .f__+^ _s i \ _. <br /> ` - zI. I ).`I.r 1��, �+ C1wti UY 11'Yv64LL:'1++. 615, N1n1 .7:z, 149:1; 2 1n5 16,1 ,�.,eCOITtiTlUltit�' i . c i » S q 0 8 0 S t 4.-. r:tiM. f\ 40U730 173 a 1772 1750 rr 1757 17� 1781 1761 1613 151 Z j"'r`"" 14. ' N ,� �' _ n g o <br /> 1:4,500 V P <br /> o 0.05 0.1 mi P19-0140, 1809 Santa Rita Rd. Suite A & B, Hill <br /> Planning Division <br /> , i i July 30,2019 <br /> FL£ NTON. <br /> o 280 560 Feet <br />