Laserfiche WebLink
13. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br /> site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br /> plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br /> development plan shall include all required information to design and construct site, grading, <br /> paving, drainage, and utilities. <br /> 14. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br /> prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br /> Official and Director of Community Development certifying the pad elevations and building <br /> locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br /> inspection for the structures. <br /> 15. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification <br /> prepared by a California licensed land surveyor or civil engineer to the Director of Community <br /> Development before the first framing or structural inspection by the Building and Safety Division. <br /> The height of the structures shall be surveyed and verified as being in conformance to the <br /> approved building heights as shown on Exhibit B or as otherwise conditioned. <br /> 16. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> 17. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, pellet fueled <br /> wood heaters, or EPA certified wood-burning appliances. The fireplace types shall be indicated <br /> on the plan and/or specification sheet(s) submitted to for issuance of building permits. (Project <br /> Specific Condition) <br /> Green Building and Sustainability Measures <br /> 18. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The residence shall be <br /> constructed to allow for future installation of a photovoltaic (PV) system and a solar water <br /> heating system. The measures shall be shown on the building permit plans for review and <br /> approval by the Director of Community Development prior to building permit issuance. The <br /> applicant shall comply with the following requirements for making the unit on the subject site <br /> photovoltaic-ready and solar water heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to <br /> the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to <br /> alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> P19-0092 Planning Commission <br /> Page 3 of 9 <br />ted downward <br /> and designed or shielded so as to not shine onto neighboring properties or streets. The type <br /> and location of all exterior light fixtures shall be reviewed and approved by the Director of <br /> Community Development prior to building permit issuance. <br /> 12. MECHANICAL EQUIPMENT: All HVAC condensing units shall be shown on the plans. (Project <br /> Specific Condition) <br /> P19-0092 Planning Commission <br /> Page 2 of 9 <br />tes Page 6 of 27 June 26, 2019 <br />