Laserfiche WebLink
33. DESIGN PER CITY STANDARDS: All public improvements shall be designed in compliance <br /> with the City Standard Specifications and Details in effect at the time of the issuance of the <br /> encroachment, grading, or subdivision permit, whichever occurs first. <br /> 34. RETAINING WALLS: All retaining walls along the street shall be located behind the public <br /> service easement (PSE), unless otherwise approved by the Director of Engineering/City <br /> Engineer. All retaining walls with a minimum height of 4 feet, measured from the bottom of the <br /> footing to the finished grade at the top of the wall, and all retaining walls with a surcharge shall <br /> be designed by a California licensed civil or structural engineer <br /> Construction <br /> 35. CONSTRUCTION PER CITY STANDARDS: All public improvements shall be constructed in <br /> compliance with the City Standard Specifications and Details in effect at the time of the <br /> issuance of the encroachment, grading, or subdivision permit, whichever occurs first. <br /> 36. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall obtain an <br /> encroachment and haul route permit from the Engineering Department prior to moving <br /> equipment to the project site or performing work in the public right of way or within public <br /> easements. The applicant's contractor shall submit a completed and signed encroachment <br /> permit application accompanied with six copies of City-approved improvement plans, proof of <br /> insurance with endorsement adding the City as an additional insured, a copy of a valid City of <br /> Pleasanton business license, applicable fees, and other requirements determined by the <br /> Director of Engineering/City Engineer. <br /> 37. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall repair <br /> damage to existing public and private improvements on and near the project site and along the <br /> haul route at their full expense caused by construction activities as determined and to the <br /> satisfaction of the Director of Engineering/City Engineer and prior to the City Council <br /> acceptance of public improvements. <br /> Utilities <br /> 38. JOINT UTILITY TRENCH: All dry utilities (electric power distribution, gas distribution, <br /> communication service, cable television, street lights and alarm systems) required to serve an <br /> existing or new development shall be installed in underground conduit in a joint utility trench <br /> subject to the review and approval of the Director of Engineering/City Engineer and prior to City <br /> council acceptance of public improvements. <br /> Stormwater and Provision C.3 of the National Pollutant Discharge Elimination System Permit <br /> 39. STORMWATER TREATMENT: The project creates and/or replaces 10,000 square feet or more <br /> of impervious surface (collectively over the entire project site) and shall comply with Section <br /> "C.3.b Regulated Projects" of the NPDES Permit No. CAS612008, and amendments, issued by <br /> the San Francisco Bay Regional Water Quality Control Board. The improvements plans shall <br /> include the Stormwater Management Plan prepared by a California licensed civil engineer, <br /> indicating the type and locations of stormwater treatment measures to be installed (numbered <br /> sequentially for identification purposes), and sizing calculations. The Stormwater Management <br /> Plan shall be subject to review and acceptance by the Director of Engineering/City Engineer, <br /> prior to the issuance of an engineering or building permit, whichever occurs first. <br /> P19-0092 Planning Commission <br /> Page 6 of 9 <br />ission <br /> Page 5 of 9 <br />applicant shall submit a written dust control plan or procedure as part of <br /> the building permit plans. <br /> P19-0092 Planning Commission <br /> Page 4 of 9 <br />