Laserfiche WebLink
BACKGROUND <br /> The City's utilities systems include water, recycled water, sewer, and stormwater. These <br /> systems include approximately 30 pump stations, 22 reservoirs, and numerous other <br /> facilities that require electrical, instrumentation, telemetry, and Supervisory Control and <br /> Data Acquisition (SCADA) system and infrastructure in order to properly operate. It is <br /> not always practical or cost effective for City staff to maintain and repair this <br /> infrastructure. Out-sourcing certain services and contracting with specific trades has <br /> proven to be an effective solution when the City does not have the staffing or specific <br /> trade expertise to handle certain tasks. <br /> DISCUSSION <br /> Utilizing as-needed service agreements allows staff to authorize the work and to have it <br /> completed in a much timelier manner then formally bidding each small project. When <br /> utilizing the as-needed service contractors to perform a task, staff will contact the <br /> appropriate contractor(s), provide a scope of services, and request a quote for those <br /> services. Based on contractor availability and pricing for that task, staff will then <br /> authorize the selected contractor to proceed with the work and the costs will be applied <br /> against the not-to-exceed limit of the agreement. <br /> As part of the bid process, all as-needed contractors provided labor and equipment <br /> rates, mark-up percentages, and their Department of Industrial Relations (DIR) number <br /> prior to agreement execution. In addition, as a condition of the agreement, each <br /> contractor will provide the required certificates of insurance and a City of Pleasanton <br /> business license number. <br /> Table 1 below provides a listing of each type of as-needed service category, the <br /> recommended contractors to enter into agreement with for that category based on <br /> pricing rates and qualifications, and the recommended not-to-exceed limit for year one <br /> of each agreement. Staff is recommending entering into agreements with multiple <br /> contractors for a single service category to have the flexibility to obtain the best <br /> combination of pricing, trade skills, and response time on a task by task basis. Since the <br /> percentage use of each contractor cannot be fully defined at this time, the total not-to- <br /> exceed agreement amounts are higher than the anticipated expenditures. However, <br /> staff will track expenditures against all agreements to ensure they do not exceed <br /> budgeted amounts. <br /> For the Utilities Division, expenditures from the as-needed service agreements are <br /> primarily funded from the Water and Sewer Repair and Replacement Funds. The <br /> FY2019/20 budget is $2,810,500. <br /> Page 2 of 3 <br />