My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
071619
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:34:59 AM
Creation date
7/11/2019 9:34:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. The City will be responsible for design of the remodeling of the existing SCADA <br /> Room that will host all related SCADA equipment including a new server room. The <br /> Consultants shall coordinate SCADA system design with remodeling design by the <br /> City. <br /> 4. Conduct a workshop that presents draft design submittal. <br /> 5. Coordinate with Cybersecurity and Infrastructure Security Agency (CISA)to conduct a <br /> security assessment of draft system design and incorporate recommendations as appropriate. <br /> 6. Provide a final design submittal package that shall incorporate City's review comments and <br /> serve as the technical scope of work confirmation for Task 2.0. <br /> 7. Provide an updated budget and schedule for procurement of software/hardware and <br /> implementation services. <br /> Assumptions: <br /> 1. Attendance at kickoff meeting and workshops, as well as review of design submittal package, <br /> may include the following from the City: <br /> a. City's Utilities Project Management Team <br /> b. City's IT Department <br /> c. City's Facilities team responsible for remodeling of the SCADA room <br /> 2. City will have up to 3 weeks to review the draft design submittal package and provide written <br /> comments. <br /> Task 2.0—Implementation Services <br /> 1. Procure SCADA system software to be specified under Task 1.0. The City's IT Department <br /> will procure required Microsoft software and all SCADA system hardware specified under <br /> Task 1.0. <br /> 2. Implement the SCADA system per the requirements to be specified under Task 1.0. <br /> Implementation shall include installation, configuration, networking and programming of all <br /> software, hardware, and connections to existing telemetry system; and cutover from existing <br /> to new system. The City's existing SCADA screen designs will be reused for design of the <br /> new SCADA systems graphical interface. <br /> 3. Perform factory and field testing. <br /> 4. Provide implementation submittals including testing documentation, as-built drawings, and <br /> O&M manuals. <br /> 7IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.