My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
071619
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:51:03 AM
Creation date
7/11/2019 8:50:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF Attachment 3 <br /> 22 III <br /> LASATONC <br /> Mission Hills Big Slide Public Outreach Meeting <br /> Location: Hansen Hills Park, 600 Junipero Street, Pleasanton, CA <br /> Date: December 15, 2018 <br /> Project: Mission Hills Big Slide Renovation <br /> Subject: Public Outreach Summary <br /> Attendees: City (Sarah Hosterman, Brandon Stewart, Matt Gruber) <br /> Below is a summary of the comments received during the public outreach meeting held on December 15, <br /> 2018 from 1:00 pm—3:00 pm. Also included are the comments received via email. <br /> Subject <br /> 1. Keep one side of the concrete stairs for exercise. <br /> 2. Install the double slide! <br /> 3. Install the climbing feature! <br /> 4. We like Option 2 (kid). <br /> 5. Limit the slides exposure to the sun by planting more trees. <br /> 6. Our young children struggle to go up the steps so we like the Option <br /> 2 access improvements. <br /> 7. The two side by side slides would be great so you can hold hands <br /> going down the slide. <br /> 8. It would be beneficial to put the rope rail replacement at kid's level. <br /> 9. Option 2 is preferred because you can race down! <br /> 10.The ropes at the sides are preferred over the chains. <br /> 11.Consider increasing the riser height on the stairs or creating a <br /> landing half way up. <br /> 12.Don't take out the slide! <br /> 13.The little kids would love option 2 (parents). <br /> ENGINEERING DEPARTMENT P. O. BOX 520, Pleasanton, CA 94566-0802 <br /> Engineering Construction Services Landscape Architecture <br /> 200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br /> (925) 931-5650 (925) 931-5680 (925) 931-5650 <br /> Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br />
The URL can be used to link to this page
Your browser does not support the video tag.