Mr.Adam Nelkie Page 2 <br /> June 24,2019 <br /> The team will review contractor submittals including engineering designs of the metal work and <br /> provide a written response within 10 business days. The team will review contractor RFIs and <br /> provide a written response no later than 5 business days.Where a contract change order has been <br /> submitted to the City, the Murraysmith team will complete a review for completeness and merit. <br /> Task 2.2—Specialty Inspections <br /> Two engineers will be present at the pre-blast inspection of the Upper Ruby Hill and Laurel Creek <br /> tanks to confirm the quantity of interior metal repairs needed including: rafters, girders, angle <br /> stiffeners, rafter braces, columns, and the overflow cone. Todd Kotey will be present at each pre- <br /> blast inspection, supported by Davina Carboni or Justin Ford. Murraysmith will perform up to two <br /> additional site visit/inspections at each tank for the duration of construction, assuming two tanks <br /> can be inspected per visit. An inspection report will be submitted to the City of Pleasanton to <br /> document findings, recommendations,and progress.Tom Frisch from Frisch Electrical will perform <br /> a site visit at the Ruby Hill Pump Station to inspect the electrical work. <br /> Task 2.3 —CP System Energization <br /> V&A will perform the final energization and CP system adjustments at the end of construction and <br /> will prepare a letter report with the tank-to-water potentials and the final output of the anodes. <br /> The anode lead wire would then be disconnected, "turning off" the CP system for the warranty <br /> period. <br /> EXCLUSIONS <br /> The following scope items are not included, but can be provided upon amendment: <br /> • Engineer's warranty inspection <br /> • Re-connecting and testing of the CP system following the warranty inspection <br /> • Record drawings (civil sheets) <br /> We look forward to working with you to the successful completion of the project. If you have any <br /> questions on the above scope, please contact me or Todd Kotey at (916) 238-6431. <br /> Sincerely, <br /> MURRAYSMITH <br /> Davina Carboni, PE <br /> Senior Engineer <br /> Enclosures: fee spreadsheet <br />