Laserfiche WebLink
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br /> 2 Mitigation Monitoring and Reporting Plan <br /> Impact Mitigation Measure Method of Verification Timing of Responsibility for Verification Complete <br /> Verification Verification Date Initial <br /> Air Quality <br /> Construction associated AQ-I: Prior to issuance of Submittal of findings Prior to City of <br /> with implementation of construction permit, development and documentation issuance of Pleasanton <br /> the Proposed Plan would project applicants that are subject to construction Community <br /> create new sources of CEQA and exceed the screening sizes in permit Development <br /> fugitive PMio and PM2,s BAAQMD's CEQA Guidelines shall Department <br /> dust emissions and ROG prepare and submit to the City of <br /> emissions, contributing Pleasanton a technical assessment <br /> to the nonattainment evaluating potential project <br /> designation of the construction-related air quality impacts. <br /> SFBAAB for 03, PM2s, The evaluation shall be prepared in <br /> and PMio. conformance with the BAAQMD <br /> methodology in assessing air quality <br /> impacts. If construction-related criteria <br /> air pollutants are determined to have <br /> the potential to exceed the BAAQMD <br /> thresholds of significance,as identified in <br /> the BAAQMD CEQA Guidelines, the <br /> City of Pleasanton shall require that <br /> applicants for new development <br /> projects incorporate mitigation <br /> measures to reduce air pollutant <br /> emissions during construction activities <br /> to below these thresholds. <br /> 3 <br />oval of the Proposed Plan and the methods of monitoring such <br /> actions. A monitoring program is necessary only for impacts which would be significant if not <br /> mitigated. <br /> If,during the course of project implementation,any of the mitigation measures identified cannot <br /> be successfully implemented,the City shall immediately inform any affected responsible agencies. <br /> The City,in conjunction with any affected responsible agencies,will then determine if modification <br /> to the project is required,and/or whether alternative mitigation is appropriate. <br /> The following consists of a monitoring program table noting the responsible entity for mitigation <br /> monitoring,the timing,and a list of all project-related mitigation measures. <br />ption of Statement of Overriding Considerations <br /> The City Council has weighed the economic,legal,social,technological,and other benefits of the proposed <br /> Plan,as set forth above in Section II.D,against the significant unavoidable impacts of the Plan identified in <br /> the Draft EIR(and discussed above in Section II.A). <br /> The City Council hereby determines that those benefits outweigh the risks and adverse environmental <br /> impacts of the Plan,and further determines that the Plan's significant unavoidable impacts are acceptable. <br /> Accordingly, the City Council adopts the Statement of Overriding Considerations, recognizing that <br /> significant unavoidable impacts will result from implementation of the Plan.Having(i)adopted all feasible <br /> mitigation measures,as stated herein and discussed in the Draft EIR;(ii) rejected alternatives to the Plan, <br /> as stated herein and discussed in the Draft EIR;and(iii) recognized the significant unavoidable impacts of <br /> the Plan, the City Council hereby finds that each of the separate benefits of the proposed Plan, as stated <br /> herein, is determined to be unto itself an overriding consideration, independent of other benefits, that <br /> warrants approval of the Plan and outweighs and overrides its significant unavoidable impacts,and thereby <br /> justifies the approval of the City of Pleasanton Downtown Specific Plan. <br /> 27 <br />would result in an operational emissions increase of 4,000 <br /> MTCO2e per year and an energy consumption increase of 168,000 million BTU per year compared <br /> to existing conditions. While the Plan would not be sufficient to align downtown Pleasanton's <br /> emissions trajectory with the goals established under SB 32 and EO S-3-05,implementation of the <br /> 26 <br />ntal <br /> 24 <br />iteria air pollutants <br /> 23 <br />