My WebLink
|
Help
|
About
|
Sign Out
PC-2019-07
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 11:29:57 AM
Creation date
6/13/2019 11:29:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/24/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-07
NOTES
P18-0109, BRUCE LYON
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Practices and Noticing <br /> 31. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br /> Monday through Saturday. No construction shall be allowed on State or Federal Holidays or <br /> Sundays. The Director of Community Development may allow earlier "start times" or later "stop <br /> times" for specific construction activities, e.g., concrete pouring. All construction equipment shall <br /> meet Department of Motor Vehicles (DMV) noise standards and shall be equipped with muffling <br /> devices. Prior to construction, the hours of construction shall be posted on site. <br /> 32. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br /> not allowed on the construction site except when needed as sleeping quarters for a security <br /> guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> 33. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br /> site for daily administration/coordination purposes during the construction period. <br /> 34. TRAFFIC MANAGEMENT PLAN: The applicant shall prepare a Traffic Management Plan (TMP) <br /> to ensure that the construction traffic will not conflict with the Foothill High School a.m. or p.m. <br /> school traffic hours, Monday through Friday. The TMP shall be submitted prior to the start of the <br /> first construction phase to the satisfaction of the Planning Division. (PROJECT SPECIFIC <br /> CONDITION) <br /> 35. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br /> construction and parking management plan to address impacts and parking demands during the <br /> construction phase of the project. The construction and parking management plan shall be <br /> subject to review and approval by the City Traffic Engineer and Director of Community <br /> Development prior to issuance of a demolition permit, or the first building permit, whichever <br /> comes first. The following items shall be incorporated into the construction and parking <br /> management plan: <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, <br /> temporary fencing, construction trailer location, and construction contractors/workers <br /> parking area; <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction activities <br /> without prior approval by the City. <br /> 36. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the project site <br /> and as far as possible from existing residences and shall be emptied to prevent odor. <br /> 37. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off-hauled from <br /> the site and disposed of in a lawful manner. No temporary stockpiling of dirt on this site shall <br /> occur without specific review and approval by the Director of Community Development. <br /> 38. NOTICE OF CONSTRUCTION: Prior to construction, the applicant shall notify neighbors within <br /> 300-feet of the project site of the construction schedule in writing. Such notice shall include <br /> contact names and numbers for property owner, agent or contractor. <br /> 39. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance coordinator" <br /> who shall be responsible for responding to any complaints regarding construction noise, dust, <br /> P18-0109 Planning Commission <br /> Page 6 of 13 <br />Per PMC 17.50) (PROJECT SPECIFIC CONDITION) <br /> P18-0109 Planning Commission <br /> Page 5 of 13 <br />gnatory to any lease for the rented units. (PROJECT <br /> SPECIFIC CONDITION) <br /> P18-0109 Planning Commission <br /> Page 4 of 13 <br />