Laserfiche WebLink
staff prepared plans which relocated the tot lot in closer proximity to the existing <br /> playground and restroom, as well as added shade to the tot lot play structure (see <br /> Attachment 1 for revised location and design). <br /> The revised location and tot lot design was presented to the Parks and Recreation <br /> Commission on May 9, 2019. The Commission unanimously recommended approval of <br /> the revised location and design. It is recommended that the City Council also approve <br /> the location and design, and allocate the $177,800 contributed by the developer into <br /> CIP No. 18756 to fund construction. <br /> The tot lot construction is expected to occur in late summer/early fall 2019 and take <br /> approximately four to six weeks to complete. The landscape improvements will follow <br /> and likely be completed in spring 2020. <br /> Submitted by: Reviewed by: Approved by: <br /> 4a/(1`, <br /> �QCrYt <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Revised playground design and location per public input <br /> Page 3 of 3 <br />