My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 3
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
052119
>
04 ATTACHMENT 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 5:07:27 PM
Creation date
5/15/2019 5:07:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/21/2019
DESTRUCT DATE
15Y
Document Relationships
04
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\052119
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 17 <br /> In other words, the landscaping Improvements maintained by the proposed Assessments <br /> specially benefit the properties within the Maintenance District, but other nearby <br /> improvements primarily benefit other proximate properties. <br /> Nonetheless, there could be certain properties that are outside the boundaries of the <br /> Maintenance District and that may benefit from the landscape Improvements. After close <br /> examination, and based on the location of the Windsor development, with Interstate 680 to <br /> the east,Arroyo de la Laguna to the west, and Bernal Avenue to the south, it was concluded <br /> that there are no proximate parcels that could be identified as receiving any special benefit <br /> from the Maintenance District Improvements. <br /> If any parcels were proximate to the Windsor development, and if it was identified that those <br /> parcels receive some special benefit from the improvements, those benefits would likely be <br /> improved views, proximity and/or access, but would not receive extension of outdoor areas <br /> nor the special benefit of parcel creation. Since those adjacent properties would only receive <br /> a 3 of the 5 major special benefits, a 60%factor would be applied. <br /> Total General Benefit to Properties Outside of the District= 0.0%: <br /> Assumptions; <br /> 0 parcels outside and adjacent to the District <br /> 90 parcels in the Maintenance District <br /> Calculation <br /> General Benefit to Property outside the Improvement District= <br /> (0/(0 + 90)) *60% = 0.0% <br /> BENEFIT TO PROPERTY INSIDE THE DISTRICT THAT IS INDIRECT AND DERIVATIVE=0% <br /> The"indirect and derivative" benefit to property within the Maintenance District is particularly <br /> difficult to calculate. A solid argument can be presented that all benefit within the <br /> Maintenance District is special, because the Improvements are clearly"over and above"and <br /> "particular and distinct" when compared with the unique proximity, access and views of the <br /> Improvements enjoyed by benefiting properties in the Maintenance District. <br /> Nevertheless, the SVTA decision indicates that there may be general benefit"conferred on <br /> real property located in the district."A measure of the general benefits to property within the <br /> Maintenance District is the percentage of land area within the Maintenance District that is <br /> publicly owned, open to the public, and used for regional purposes such as major roads, rail <br /> lines, hospitals, and other regional facilities because such properties, while physically within <br /> the Maintenance District, are used for regional purposes and could provide indirect benefits <br /> to the public at large. In this case, essentially 0% of the land area is used for such regional <br /> purposes. <br /> Cm of PLEASANTON <br /> LIGHTING&LANDSCAPE MAINTENANCE DISTRICT NO.1993-1,WINDSOR SCtConsultingGroup <br /> ENGINEER'S REPORT,FISCAL YEAR 2019-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.