Laserfiche WebLink
42. The plans submitted for issuance of building permit shall indicate all existing easements <br /> on the project site. <br /> Operations Services Center <br /> 43. Chabad of the Tri-Valley shall upgrade and/or repair the existing sanitary sewer lateral <br /> serving the subject site as necessary in accordance with the City standards. The plans <br /> submitted for issuance of building permit shall include design details, subject to review <br /> and approval by the Director of Operations Services Department. The upgrade to the <br /> existing sanitary sewer lateral shall be completed prior to the occupancy of the <br /> preschool. <br /> Landscape Architect <br /> 44. Detailed landscape and irrigation plans encompassing all planting areas, both on-site <br /> and off-site, must be included in the building permit plans. All plans shall be prepared by <br /> a licensed landscape architect and shall provide the species, location, size, quantities, <br /> and spacing of all plants. Minimum plant sizes are 1-gallon containers for ground cover, <br /> 5-gallon for shrubs, and 15-gallon for trees. Plant species shall be of a drought-tolerant <br /> nature and the irrigation design shall utilize low-volume drip, bubbler, or other water <br /> conserving irrigation systems to the maximum extent possible. The drawings shall be <br /> reviewed and approved by the City's Landscape Architect prior to building permit <br /> issuance and Chabad of Tri-Valley operation under this conditional use permit approval. <br /> 45. The project shall comply with the City of Pleasanton's Water Efficient Landscape <br /> Ordinance (WELO) and Bay Friendly Basics Landscape Checklist. The applicant shall <br /> submit a Landscape Documentation Package in PDF format to the City's Landscape <br /> Architect Division, which shall be reviewed and approved by the City's Landscape <br /> Architect prior to issuance of building permits. The Landscape Documentation Package <br /> shall include: <br /> a. Project Information; <br /> b. Water Efficient Landscape Worksheet; <br /> c. Soil management report; <br /> d. Landscape design plan; and <br /> e. Irrigation design plan. <br /> 46. Upon completion of construction and prior to final inspection by the Building and Safety <br /> Division, the applicant's landscape architect shall submit a Certificate of Completion <br /> Package in PDF format to the City's Landscape Architect Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> P16-0288 and P16-188, 3370 Hopyard Road City <br /> Council <br /> Page 7 of 10 <br />