Laserfiche WebLink
• 4- Federal Signal COM1200-SQ/ RD 12 vdc floodlights will be provided and installed at the front and <br /> rear of the body as follows: (2)on the streetside and (2)on the curbside. Lights to be positioned to <br /> illuminate the cargo area. <br /> Miscellaneous Items: <br /> • A Vanair Tool Lift with tether control will be provided an installed in the right side rear section of the <br /> second vertical compartment. <br /> • Two (2)cone holders installed on the front bumper. <br /> • Provisions for a Tamper Machine installation at the driver's side at the rear of the truck in the tailshelf <br /> area. <br /> • A Pro-Visions TV-950 camera system will be provided and installed. Includes a 9" quad monitor and <br /> three night vision cameras. One camera at the rear and one on each side of the cab. <br /> • Two (2) removable steps — (beverage truck style), will be provided and installed To be located on the <br /> left and right sides under the body at the rear wheels <br /> • Two (2) pull out style steps will be provided and installed. To be located on the left and right sides <br /> under the front compartment To be reviewed and discussed at the Pre-Construction Meeting. <br /> • Two pull out lockable drawers will be provided and installed. To be located one (1) on the left side <br /> and one (1) on the right side of the truck directly ahead of the rear wheels and under the second front <br /> compartment. <br /> • A spring retractable gas welding hose reel with 25 feet of oxy! ace hose will be provided and installed <br /> in the curbside second compartment <br /> • A plywood rack capable of holding 3 sheets of 1 1/8 plywood will be installed at the front of the body. <br /> Pre-Construction Meeting: <br /> Customer(s) visits facility to inspect the chassis. body and equipment. This meeting will be conducted <br /> prior to installing and manufacturing some of the equipment on the chassis. Body drawings will be <br /> provided for approval at or before this meeting. The customer is responsible for their travel arrangements <br /> Pre-Paint/Final Inspection: <br /> The customer will be notified upon request prior to the truck being painted. The customer is responsible <br /> for their travel arrangements. <br /> Paint and finish: <br /> Body exterior and compartment interiors to be painted white to match the cab. <br /> All safety items i.e., outriggers, steps, handrails, tamper and cone brackets to be painted orange <br /> Line- X will be installed on the rear tailshelf and the cargo area floor and walls. <br /> All surfaces to be acid etched, cleaned of rust, grease, oil, dirt, millscale, prior to the prime coat of paint. <br /> All exterior and interior surfaces coated with minimum two coats of metal primer <br /> Body exterior painted with minimum two coats paint to match cab. <br /> Body and Equipment Installer Requirements: <br /> Must be located within 50 miles of Pleasanton. CA. <br /> • Page 13 <br />