Laserfiche WebLink
PROS/CONS <br /> Pros Cons <br /> Building design is architecturally compatible Loss of a parking structure within the mall <br /> with the other buildings in Pleasanton, as area. <br /> conditioned. <br /> Consistent with the allowed uses. Demolishing a building that could be <br /> refurbished. <br /> Provide opportunity to expand the mall with <br /> a new buildings and uses with improved <br /> architecture and low-water use landscaping. <br /> PUBLIC NOTICE <br /> Notice of this workshop was sent to all property owners and tenants/occupants within <br /> 1,000 feet of the site as shown in Exhibit G. At the time of report publication, Staff received no <br /> comments or concerns. Any public comments received after publication of this report will be <br /> forwarded to the Commission. <br /> ENVIRONMENTAL ASSESSMENT <br /> The proposed project is consistent with the development density established within the <br /> Pleasanton 2005-2025 General Plan and associated Environmental Impact Report (EIR) which <br /> was adopted and certified in July 2009. From environmental review pursuant to the California <br /> Environmental Quality Act Guidelines, Section 15183, Projects Consistent with a Community <br /> Plan, General Plan, or Zoning, additional environment review is not required except as <br /> necessary to examine whether there are project-specific significant effects which are peculiar <br /> to the project or its site. A project-specific addendum to the General Plan EIR and Traffic <br /> Impact Analysis was prepared for the project. The analysis in the attached Addendum (Exhibit <br /> D) concludes that the proposed project will not create any significant effects peculiar to the <br /> project on- or off-site and, therefore, confirms that no further environmental review is required. <br /> SUMMARY/CONCLUSION <br /> Staff worked with the applicant to revise the proposal to address the Planning Commission's and <br /> staff's comments concerning site layout, streetscape, and appearance along Stoneridge Mall <br /> Road. Staff finds the development is consistent with the Development Agreement, General Plan, <br /> and zoning designation for the site. The center would provide additional enhanced shopping <br /> options for residents within Pleasanton, the Tri-Valley region, and the San Francisco Bay Area. <br /> Primary Authors: Jennifer Hagen, Associate Planner, 925-931-5607 orjhagen a( ,citvofpleasantonca.gov. <br /> Reviewed/Approved By: <br /> Steve Otto, Senior Planner <br /> Ellen Clark, Planning Manager <br /> Gerry Beaudin, Director of Community Development <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 17 of 17 <br />date common amenities, would not allow for a new building with improved architecture and <br /> improved safety, energy efficiency and other Green Building measures required by current <br /> codes, and would not allow for on-site storm water treatment. Therefore, staff believes the <br /> proposed project represents an acceptable development scenario. <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 16 of 17 <br />ot line adjustment will be required in order to relocate the existing lot lines so that they don't <br /> cross any new buildings. In addition, the applicant will need to relocate or remove an existing <br /> Public Service Easement (PSE) that runs through the property. As proposed, the future 28-feet <br /> of right-of-way to include a new landscape strip and public sidewalk as well as future street <br /> improvements along Stoneridge Mall Road will be required to be dedicated to the City or <br /> include public easements. Conditions of approval have been included to require all of these. <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 15 of 17 <br /> in Figure 5. <br /> The applicant will be required to dedicate the land or provide public easements over the land in <br /> the future, when the additional Stoneridge Mall Road improvements move forward. The new <br /> pedestrian sidewalk and planter strip along the inner part of Stoneridge Mall Road would serve <br /> as the protype for all future development within the inner loop of the Mall creating greater <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 8 of 17 <br />