My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
041819
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:02:22 PM
Creation date
4/15/2019 3:05:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Staff Contact(s): Mike Tassano <br />53. State Route 84 Transportation/Traffic Project <br />SR 84 <br />There are two separate projects underway on State Route (SR) 84. The segment of SR 84 <br />from Concannon Boulevard to Ruby Hill Drive is under construction and will widen the <br />roadway from one lane in each direction to two lanes in each direction. This project is <br />managed by Alameda County Transportation Commission and has an estimated project <br />completion date of fall 2019. <br />The segment of SR 84 from Pigeon Pass to I-680 has completed environmental review <br />and Caltrans adopted the environmental document in the summer of 2018. Preliminary <br />engineering and design has started. The design process and right of way acquisition will <br />take approximately two years with construction to follow in 2021. <br />Construction of the segment of SR 84 from Pigeon Pass to I-680 will be the final segment <br />in a series of improvements to widen SR 84 to expressway standards from 1-580 in <br />Livermore to I-680 in Sunol. Environmental review of the SR 84 project began in 2002, <br />and completion of this final segment will conclude this nearly 20 -year project. <br />• Status Under Review <br />• Next Steps/Details: Alameda CTC to awarded design contract in spring 2018 <br />and began ROW acquisition. Caltrans approved the <br />Environmental Document (Spring 2018). Complete ROW <br />and Design (2020) begin construction (2021). Alameda <br />County Transportation Commission projects target <br />construction start date of March/April 2021. <br />• Staff Contact(s): Mike Tassano <br />54. Bart to Ace Transportation/Traffic Project <br />Valley Link <br />In October 2017 the Governor signed Assembly Bill 758 which created The Tri -Valley — <br />San Joaquin Valley Regional Rail Authority. This new authority has been created for the <br />sole purpose of connecting Bart to ACE. The Authority has selected a hybrid powered, <br />multiple -unit vehicle technology with the ability to convert to fully electric power in the <br />future <br />Valley Link is proposing to provide a new rail service from the existing Dublin / <br />Pleasanton BART Station to San Joaquin County, utilizing existing rights-of-way in the <br />center of the I-580 corridor to provide connectivity between ACE and Bart. Valley Link <br />is proposed to provide frequent, all -day regional rail service with future expansion all the <br />way to Lathrop in the Central Valley <br />As a first phase in the Valley Link project, the Authority has recommended an initial <br />segment serving the RM3 project corridor, originating from a BART connection at <br />Dublin/Pleasanton Station and continuing to a proposed station at Greenville Road in <br />Livermore, in the I-580 median, including a proposed station at Isabel Road <br />Page 19 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.