My WebLink
|
Help
|
About
|
Sign Out
PC-2019-02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2019 10:09:32 AM
Creation date
4/11/2019 10:07:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/20/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-02
NOTES
P19-0027, SMALL WIRELESS FACILITIES ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(d) Additional Procedures. The City Council authorizes the Community <br /> Development Director to establish other reasonable rules and regulations for duly <br /> filed applications, which may include without limitation regular hours for <br /> appointments with applicants, as the Community Development Director deems <br /> necessary or appropriate to organize, document and manage the application <br /> intake process. All such rules and regulations must be in written form and publicly <br /> stated to provide all interested parties with prior notice. <br /> SECTION 2.4. APPROVALS AND DENIALS; NOTICES <br /> (a) Public Notice. Within approximately 10 days after an application is received and <br /> prior to any approval, conditional approval or denial, the City shall mail public <br /> notice to all properties and record owners of properties within 300 feet from the <br /> project site. The notice must contain: (1) a general project description; (2) the <br /> applicant's identification and contact information as provided on the application <br /> submitted to the City; (3) contact information for the Community Development <br /> Director for interested parties to submit comments; (4) a statement that the <br /> Community Development Director will act on the application without a public <br /> hearing but that any interested person or entity may appeal the Community <br /> Development Director's decision directly to the City Manager or his/her designee; <br /> and (5) a general statement that the FCC requires the City to take final action on <br /> small cell applications within 60 days or 90 days, depending on the nature of the <br /> proposed facility. <br /> (b) Administrative Review. Not less than 10 calendar days after the public notice <br /> required in Section 2.4(a) is sent, and not more than 29 calendar days after the <br /> application has been deemed complete, the Community Development Director <br /> shall approve, conditionally approve or deny a complete and duly filed small cell <br /> permit application without a public hearing. <br /> (c) Required Findings. The Community Development Director may approve or <br /> conditionally approve a complete and duly filed application for a small cell permit <br /> when the Community Development Director finds: <br /> (1) the proposed project meets the definition for a "small wireless facility" as <br /> defined by the FCC; <br /> (2) the proposed project would be in the most preferred location within 750 feet <br /> from the proposed site in any direction or the applicant has demonstrated with <br /> clear and convincing evidence in the written record that any more-preferred <br /> location(s) within 750 feet would be technically infeasible; <br /> (3) the proposed project would not be located on a prohibited support structure <br /> identified in this Policy; <br /> {00032392;5} page 10 /28 <br />application <br /> within a batch is deemed incomplete, the entire batch shall be automatically <br /> deemed incomplete; (iv) if any application is withdrawn or deemed withdrawn from <br /> a batch, all other applications in the entire batch shall be automatically deemed <br /> withdrawn; and (v) if any application in a batch fails to meet the required findin s <br /> fora proval, the entire batch shall be denied in the manner described in <br /> {00032392;5} page 9/28 <br />rd and all the facts that allow the City to conclude the standard <br /> has been met—bare conclusions not factually supported do not constitute a <br /> {00032392;5} page 6/28 <br />le report(s), adjoining deeds, and underlying <br /> recorded maps to the Director of Engineering/City Engineer, prior to submittal of the first plan <br /> Vesting Tentative Map 8483 Planning Commission <br /> Page 4 of 5 <br />