Laserfiche WebLink
project, to be carried out in three phases. Phase I has been constructed. Phases 2 and <br /> 3, which have yet to be built, require 9 additional parking spaces to be provided, for a <br /> total of 75 spaces split between two parking areas: a 45-space lot to the east of St. <br /> Clare's, and a 30-space lot to the southwest of the (now) Chabad building, connected <br /> by an access driveway. The parking lot was to have been shared between the two <br /> users. <br /> As shown in Figure 1, below, it appears that the Chabad's proposed patio and <br /> playground location would conflict with the parking lot access and design, contemplated <br /> in the CUP relating to St. Clare's Master Plan. <br /> Figure 1: Proposed Chabad Site Plan ova 2005 St. Clare's Master Plan <br /> IP 4 <br /> OTT C <br /> + <br /> �U�1+ 1 Q <br /> +_ .,,em rRb � li�Meis�vN <br /> l <br /> , <br /> NIF rj 0 <br /> . i:. ,, 1x <br /> a I Play1 1 �� 1t� P <br /> „ground r �, <br /> a 1 0 ,.. <br /> 0 <br /> z , er nff r— 7r P aa, �AM., no". , C) <br /> it, j ok1 0' O1k 4) <br /> , /-- <br /> , ',kr—% L <br /> t� .; F . ,_ <br /> ' C <br /> % % '.;,' C \ \ <br /> 1 LL <br /> t r; <br /> I — St Clare's Church \ A h :1 <br /> /l r / 1.—...,..1 r ,� t . <br /> ,f�Stf/je <br /> 04.141 <br /> \\ - r` \'- '`', '\ n\ \ . <br /> ) .111\-:---2-----2—jiw''.6 '"1".:::—DFTIVE—S. VALLEY TRAIL <br /> Page 10 of 14 <br />