My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
031919
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 12:09:24 PM
Creation date
3/15/2019 12:09:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> WATER SUPPLY AND DISTRIBUTION SYSTEM <br /> IMPROVEMENTS PROJECT <br /> PROJECT BACKGROUND <br /> The purpose of this project is to evaluate nitrification within the City of Pleasanton's(City)potable water <br /> distribution system and to perform a condition assessment and chemical system evaluation of Wells 5,6, <br /> and 8.The nitrification issues are particularly a problem during the summer months in the Foothill Tank <br /> service area of the distribution system.The City aggressively cycles distribution system tanks to help limit <br /> water age and reduce nitrification.However,this is labor intensive and the City would like to evaluate <br /> mixing systems to help reduce the operational effort associated with the deep cycling of the tanks.This City <br /> has recently rehabilitated Well 8 pump and casing.However,a facility-wide assessment has not been <br /> performed at Well 8.This Scope of Work identifies the preliminary design engineering services to be <br /> provided for the Project and is based on the assumptions listed in each task below. <br /> VISION STATEMENT <br /> Overall,our vision of this project is to provide recommendations for controlling nitrification within the City's <br /> potable water distribution system, review tank residual control system and provide a recommended system <br /> to pilot at the Foothill Tank,and to perform a condition assessment of Wells,5,6,and 8.This project <br /> includes the following major tasks as described in the scope of work below: <br /> • Nitrification Evaluation:The nitrification evaluation includes reviewing sampling/analysis performed <br /> by the City, reviewing the distribution system water quality to assess the nitrification problems, <br /> facilitate meetings with Zone 7 to discuss water quality,development of a sampling plan, <br /> review/analysis of the sampling data,and to develop a summary report. <br /> • Tank Residual Control System Pilot:This task includes evaluation of tank mixing systems and <br /> implementation of a tank mixing pilot at the Foothill Tank.The pilot will include a full-scale tank mixing <br /> system and ancillary equipment. <br /> • Well 5,6,and 8 Condition Assessment:This task includes a condition assessment of Wells 5,6,and 8 <br /> in the development of a Basis of Design report for improvements at each facility. <br /> We have developed a road map to show the basic framework for how we expect to complete the project.The <br /> work plan identifies the major deliverables for completing the tasks of the project.Our proposed work plan is <br /> shown on page 9 of the scope of work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.