My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2019
>
031419
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 5:04:10 PM
Creation date
3/7/2019 5:04:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/14/2019
DESTRUCT DATE
5Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with most other trails in the City as well as the character of the downtown area and the <br /> expectations of trail users. <br /> For visualization, the proposed parking lot will be similar to the Firehouse Arts Centers <br /> parking lot: <br /> -The proposed parking lot consists of a 56-foot-wide paved parking lot to accommodate <br /> 140 perpendicular parking stalls (8.5 feet x 17 feet spaces on the west side; 8.5 feet x <br /> 15 feet on the east side) with 24-foot drive aisle, an 8-foot concrete pathway, and a <br /> landscaped area ranging from zero- to 5-feet wide adjacent to the property east and <br /> west. <br /> -The Firehouse Arts Center parking lot consists of a 56-foot-wide paved parking lot to <br /> accommodate 91 (9 feet x 16 feet) perpendicular parking stalls with a 24-foot, two-way <br /> drive aisle, an 8-foot concrete pathway, a 6-foot trail path on decomposed granite, and <br /> landscaped areas buffered between property lines, the parking lot, and pedestrian/trail <br /> pathways. <br /> Staff believes that the proposed design is the best design possible on the available <br /> right-of-way, meeting the project's goal in providing the maximum number of parking <br /> spaces and accommodating pedestrian access through the corridor. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Start of Design: March 2018 <br /> Start of Construction: August 2019 <br /> Construction Completion: Spring 2020 <br /> ACTION <br /> Approve the sign. <br /> Submitted y: <br /> 1 ' <br /> Huy Ho <br /> Engineering <br /> Attachment: <br /> 1. Downtown Parking Lot Design <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.