My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
021919
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 4:40:20 PM
Creation date
2/13/2019 2:41:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/19/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other irrigation efficiency device. The proposed type of irrigation efficiency device <br /> shall be shown on the plans submitted for the issuance of building permits. <br /> 27. A final landscape plan and irrigation plan shall be submitted to and approved by the <br /> Planning Director as part of the building permit plan sets prior to issuance of a <br /> building or on-site permit. The landscaping and irrigation plans are subject to the <br /> review and approval by the Planning Director. The project developer shall provide <br /> root control barriers and four(4)inches perforated pipes for trees in planting areas <br /> less than ten(10)feet in width,as determined necessary by the Planning Director at <br /> the time of review of the final landscape plan. <br /> 28. All planting materials shall be minimum 15 gallon for trees, 5 gallon for shrubs,and <br /> one gallon for ground cover, unless otherwise approved by the Planning Director <br /> and/or the City Landscape Architect. <br /> 29. Prior to occupancy,the project developer shall certify in writing to the Planning <br /> Director that the landscaping has been installed in accordance with the approved <br /> landscape and irrigation plans with respect to size, number, and species of plants and <br /> overall design concept. <br /> 30. All building and/or structural plans must comply with all codes and ordinances in <br /> effect before the Building Department will issue permits. <br /> 31. Building and situs plans are to be submitted to the Building Department on computer <br /> disk in a format approved by the Director. Digitized information shall be submitted <br /> before requesting a final inspection and should reflect as-built situs and architectural <br /> information as approved by the Director. <br /> 32. At no time shall campers, trailers,motor homes,or any other vehicle be used as living <br /> or sleeping quarters on the construction site. All such vehicles shall be removed from <br /> the site at the end of each workday. A temporary construction trailer shall be allowed <br /> on site during construction for use during the allowed hours of operation. <br /> 33. Final inspection by the Planning Department is required prior to occupancy. <br /> 34. Portable toilets used during construction shall be emptied on a regular basis as <br /> necessary to prevent odor. All demolition activities and all construction activities <br /> shall be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through Friday. No <br /> construction shall be permitted on Federal Holidays. All construction equipment <br /> must meet DMV noise standards and shall be equipped with muffling devices. <br /> 35. There shall be no truck deliveries, parking lot sweeping, or garbage pick-up between <br /> the hours of 10:00 PM and 6:00 AM during the period of construction. This does not <br /> affect the regularly scheduled waste pick-up schedule currently established by <br /> Pleasanton Garbage Service. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.