My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
121818
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 1:44:59 PM
Creation date
12/12/2018 1:44:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/18/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—First/Bernal Intersection—Preliminary Design 11/09/2018 <br /> These exhibits are for illustrative purposes and will be developed based on the proposed <br /> alignments and engineer's judgement. Plat and legal documents are excluded from this <br /> scope of work and will be developed at a future phase. <br /> 241 Conceptual Design <br /> Develop Conceptual Designs depicting four potential alternative alignments of Bernal <br /> Avenue to assess preferred roadway geometry and preliminary impacts to adjacent <br /> properties. <br /> The four alignments studied will be based on the following criteria: <br /> • Simplified geometry <br /> • Cost effectiveness <br /> • Aligned to the north <br /> • Aligned to the south <br /> A technical memorandum will be included with the alignment drawings and right of way <br /> engineering exhibits. This memorandum will summarize the anticipated property <br /> required and construction easements necessary, magnitude of costs relative to each <br /> other and a summary of the pros and cons of each alternative. <br /> 242 Operations Analysis & Documentation <br /> Analyze vehicle operations at the First/Bernal/Sunol intersection for the AM and PM <br /> peak hours using SimTraffic. The primary purpose of this analysis will be to determine <br /> operation effects of separating the northbound vehicle right-turn movement from the <br /> northbound bicycle through movement. The results of this analysis will be summarized <br /> in a memorandum. The memorandum can be revised once based on comments from <br /> the City. As part of this task, AM and PM peak period intersection turning movement <br /> counts can be collected if desired. <br /> 250 Preliminary Plans (35%) <br /> Develop Preliminary Plans to establish fundamental elements of the design. The <br /> Preliminary Design Phase is intended to allow CITY, utility companies and other involved <br /> agencies to review and comment upon the basic design concepts early in the process. <br /> The proposed plans for this preliminary submittal include: <br /> • Title/Index Sheet <br /> • Typical Cross Sections <br /> • Preliminary Improvement Plan <br /> • Preliminary Stormwater Treatment Plan (if required) <br /> • Preliminary Landscape Plan (no Irrigation) <br /> • Preliminary Signal Plan <br /> 251 Preliminary Cost Estimate (35%) <br /> Prepare a Preliminary Estimate of Probable Construction Cost based on items and <br /> quantities of work shown on the Preliminary Plans and other anticipated improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.