My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
120418
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2018 8:42:17 AM
Creation date
11/27/2018 5:03:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/4/2018
DESTRUCT DATE
15Y
Document Relationships
16 ATTACHMENT
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2018\120418
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t. TAii rt <br /> t <br /> FOOTHILL . <br /> HIGH , <br /> SCHOOi4,, �rtrr r'tinfoil 1 rt f <. <br /> H,.— .I j- <br /> ,, t r ' Install 6 foot bike lane t---7. '' <br /> _2 i with 7 foot striped buffer ,s <br /> i Widen sidewalk to 10'and <br /> where feasible <br /> install wayfinding signage <br /> 4+, ri if ' <br /> '.4 - -_. <br /> v <br /> +�s>_ - _ _ , <br /> Continue bicycle lane striping through <br /> the existing gap under tree canopy <br /> Character Area 3 (Bernal Avenue to Castlewood Drive) <br /> The southernmost section of the Foothill Road corridor consists of low density residential <br /> and recreational areas. Due to limited development opportunities and frequent right-of- <br /> ways constraints, proposed improvements along this section of Foothill Road are minimal. <br /> Quick Build, Near-Term and Long-Term improvements for Character Area 3 are listed in <br /> Table 6 (page 50). The improvements include buffered bike lanes, widening Foothill Road <br /> and providing additional striping. <br /> Foothill Sidewalk South of Foothill High School <br /> Through the public outreach process for the Foothill Road BCP, feedback was received <br /> regarding a sidewalk concern between Muirwood Drive (South) and Puri Court. <br /> While not part of the Foothill Road BCP, staff is in the process of scheduling a short-term <br /> improvement to the area. The improvement consists of replacing the asphalt sidewalk and <br /> installing a pedestrian/bicycle railing. The ultimate improvement requires roadway <br /> widening and the construction of a new retaining wall to accommodate the buffered bike <br /> lanes and the multiuse trail. The railing is scheduled for installation over the Pleasanton <br /> Unified School District winter break. <br /> Submitted by: Fiscal Review: Approved by: <br /> 4a --- <br /> F <br /> /7(hfi — <br /> (IU <br /> erry Beaudin Tina Olson Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: Foothill Road Bicycle Corridor Plan <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.