My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
120418
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 2:54:31 PM
Creation date
11/27/2018 2:54:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/4/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruby Hill Additional Water Storage Corrosion Repairs; Water Master Plan Update; and <br /> Water Pump and Motor Upsizing projects. Staff recommends the transfer of$19,984 <br /> from the Water Fund Surplus Reserve to fully fund the project. <br /> A total of six change orders were issued for this project for a total of$141,746. Most of <br /> the project-related changes were associated with covering the shift premium to <br /> complete the tie-in work at night and address unforeseen conditions when actual field <br /> conditions did not match record drawings. West Coast Arborists, Inc. was contracted <br /> under the City's on-call contract to remove impacted trees where existing hydrant <br /> laterals were replaced. <br /> The work by Northern Underground Construction Inc., is complete and staff <br /> recommends the acceptance of the project. <br /> Submitted by: Fisc I Review: Approve by: <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director o ngineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.