My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
110618
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 2:56:19 PM
Creation date
10/31/2018 2:56:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street Name Begin Location End Location <br /> Embarcadero Court Stoneridge Mall Road End <br /> Cubby's Dog Park <br /> The existing Cubby's Dog Park parking lot was expanded from 25 marked spaces to 40 <br /> marked spaces. The expansion work consisted of grading and installation of aggregate <br /> base and hot mix asphalt, installation of concrete curb and valley gutter, installation of <br /> new trees and irrigation, pavement coating of the existing parking lot, and striping. <br /> Budget <br /> The final construction contract cost, including contract change orders, was $3,951,518. <br /> The following change orders resulted in a net increase of $243,948 to the contract <br /> amount: <br /> 1. Increase of $65,725 for adjusting existing AT&T facilities. AT&T facilities were to be <br /> lowered/adjusted by AT&T, but AT&T could not meet the City's schedule to perform <br /> the work. AT&T requested that the City lower/adjust the facilities and AT&T would <br /> reimburse the City for the cost. The work came in at $63,800, under the original <br /> amount of the change order, and the contract amount was subsequently adjusted <br /> as part of the balancing change order. A request for reimbursement in the amount <br /> of $63,800 has been submitted to AT&T. <br /> 2. Increase of$16,071 for adjusting existing PG&E facilities. PG&E facilities were to <br /> be lowered/adjusted by PG&E, but PG&E could not meet the City's schedule to <br /> perform the work. PG&E requested that the City lower/adjust the facilities and <br /> PG&E would reimburse the City for this cost. The work came in at $16,714, over the <br /> original amount of the change order, and the contract amount was subsequently <br /> adjusted as part of the balancing change order. A request for reimbursement in the <br /> amount of$16,714 has been submitted to PG&E. <br /> 3. Increase of$100,909 to resurface Embarcadero Court. This street was in poor <br /> condition and in need of repair. <br /> 4. Increase of $14,574 to haul and spread project soils to Bernal Community Park for <br /> overflow parking. <br /> 5. Decrease of $588 for MCK's reimbursement of work performed by City's on-call <br /> contractor to fix a light pole that was accidentally hit by MCK. <br /> 6. Increase of $4,823 for payment adjustment due to fluctuations in the Oil Price Index <br /> as allowed by the project specifications. <br /> 7. Increase of $42,434 as the result of an increase in contract quantities such as <br /> asphalt concrete, pavement repair, adjustment of existing irons, and striping, etc. as <br /> compared to the engineer's estimate of quantities (balancing change order). <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.