My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
101618
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2018 4:30:51 PM
Creation date
10/12/2018 4:30:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/16/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also, planning and design is proposed for other Chain of Lakes projects such as the Chain of Lakes - <br /> Cope Lake to DVWTP Pipeline and Chain of Lakes Facilities and Improvements for the Water System. <br /> Projected end of fiscal year balances for Fund 120 are shown in the table below: <br /> FY 2019 FY 2020 FY 2021 FY 2022 F\ 2023 Fl 2024 <br /> Fund 120 <br /> Ending Balance 532,655,791 $38,592,597 540,246,975 $40,694,007 $16,956,017 $3,830,279 <br /> Water Supply Reliability Projects <br /> In a normal year, over eighty percent of the Agency's supply is derived from the State Water Project. The <br /> State Water Project reliability has been declining over the years due to increasingly stringent regulations, <br /> declining infrastructure and Delta conditions, and climate change. To protect the Livermore Valley's <br /> major water supply,the Agency has been supporting the California WaterFix. <br /> While the Agency's current plan includes participation in the California WaterFix, the findings from the <br /> 2016 Water Supply Evaluation Update (WSE Update) indicated the Agency's need to pursue additional <br /> water supply options to bolster interim reliability until California WaterFix is in place, to address the <br /> uncertainties of future regulatory requirements and impacts on Delta water supply,to potentially replace a <br /> water transfer agreement with Byron Bethany Irrigation District and to meet the demands of future <br /> customers. To that end, the Agency continues to evaluate alternative water supply and storage options <br /> such as the Bay Area Regional Desalination Project, Potable Reuse, Los Vaqueros Expansion, Sites <br /> Reservoir, and water transfers. Ultimately, the Agency may choose to implement one or a portfolio of <br /> these options depending on the results of the studies and planning efforts, the amounts and timing of <br /> development and conservation,and the determination of costs and benefits to the Livermore Valley. <br /> The Water Supply Reliability projects under consideration are the Bay Area Regional Desalination <br /> Project,Potable Reuse, Los Vaqueros Expansion and water transfers. At this time,is anticipated that Sites <br /> Reservoir will be funded from Connection Fees and is not included in the water rates. <br /> Moving forward, staff anticipates continued pursuit of a number of long-term water supply alternatives. <br /> With the 2018/2019 Water Supply Evaluation Update(2018/2019 WSE Update),the Board is expected to <br /> direct staff on which options to continue to pursue. While the analysis for the 2018/2019 WSE Update is <br /> still in progress, staff expects that Water Supply Reliability Projects will be needed to meet Zone 7's <br /> Reliability Policy for existing customers as well as to meet future demands from development. Funding <br /> currently exists for development through Fund 130; a similar source of funding is required to serve the <br /> needs of existing customers. <br /> For planning purposes, staff has assumed that California WaterFix and other water supply reliability <br /> projects could provide existing customers long-term reliability in accordance with Board policy. For <br /> example, Los Vaqueros Reservoir Expansion would provide storage and a source of emergency supply. <br /> Water transfer purchases would be needed in the interim before any large-scale water supply project is <br /> implemented in the next eight to fifteen years. Based on these assumptions—and accounting for available <br /> funds from Fund 310—staff estimates a need for a minimum of$3M and up to $15.2 million in Water <br /> Supply Reliability Projects funding from water rates from FY 2018-19 through FY 2021-22. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.