A summa of the Fund 120 Water S stem CIP is shown in the table below. <br /> Fund 120 Ten-Year CIP($millions) <br /> TOTAL TOTAL <br /> FY FY F1' Fl"2023/24- <br /> PROGRAM Fl 2019 10-Year <br /> 2020 2021 2022 2023 Five-Year FY 2027/28 <br /> CIP CIP <br /> Buildings&Grounds $0.05 $0.05 $0.25 $0.30 <br /> Groundwater Basin $0.25 $0.51 $0.17 $0.93 $0.80 $1.73 <br /> Mana l ement <br /> Program Management $0.07 $0.09 $0.09 $0.11 $0.38 $0.75 $1.10 $1.85 <br /> Regulatory Compliance $0.14 $0.14 $0.15 $0.15 $0.16 $0.74 $0.89 $1.63 <br /> Transmission&Distribution $0.38 $0.65 $7.32 $4.63 $16.07 $29.05 $11.44 $40.49 <br /> Water Supply& $0.51 $0.13 $0.80 $2.10 $1.08 $4.62 $33.50 $38.12 <br /> Conve ance <br /> Water Treatment Facilities2 $32.37 $4.49 $2.95 $4.74 $18.77 $63.32 $18.29 $81.61 <br /> Wells $3.47 $1.91 $0.24 $1.73 $1.21 $8.56 $8.79 $17.35 <br /> Grand"focal 537.2.4 $7.92 S11.72 S13.47 $37.67 $108.02 575.06 5183.48 <br /> Near-term projects are related to Chain of Lakes <br /> 2 Assumes bond proceeds of$19M for the PPTWP Ozone Project and$16M cash funding for the PPWTP Upgrades Project <br /> Current Major CIP Projects: <br /> Del Valle Water Treatment Plant Ozone Project. This project consists of improvements to the Del Valle <br /> Water Treatment Plant including, but not limited to: new ozone generation facility, new ozone contactor <br /> structure, new chemical facilities including liquid oxygen and carbon dioxide, new electrical facilities, <br /> new water softening facility, new utility water pump station, new emergency generator, new chlorine <br /> contact pipeline, modifications to existing filters, chemical systems, piping, utilities, structures and site. <br /> The estimated cost of the DVWTP ozone project is approximately $49 million, with $38 million paid <br /> bond proceeds and the remainder $11 million will be paid from the Fund 120 capital projects reserve <br /> balance.The project is expected to be complete by May 2020. <br /> Patterson Pass Water Treatment Plant Upgrades and Ozonation Project. This project consists of <br /> improvements to the Patterson Pass Water Treatment Plant including, but not limited to: new ozone <br /> generation facility, new ozone contactor structure, new chemical facilities including liquid oxygen and <br /> carbon dioxide, new electrical facilities, new emergency generator,new chlorine contactor structure, new <br /> filters with filter gallery,new clearwell and pump station,and modifications to existing chemical systems, <br /> piping, utilities, structures, and site. The plant expansion increases plant capacity from approximately 19 <br /> million gallons per day (mgd) to 24 mgd. The estimated total construction cost for this project is <br /> approximately $75 million. The estimated construction cost for the ozonation portion is $40 million, of <br /> which approximately $19 million is expected to be paid from the proceeds of the Bonds. This project is <br /> expected to be complete by early-2022. <br /> In addition to the DVWTP Ozone and PPWTP Upgrades projects, there are other significant projects <br /> underway that are designed to maintain existing infrastructure: <br /> ) Chain of Lakes Well 1 Stabilization Project($3.4M) <br /> ) Dougherty Reservoir Recoating and Rehabilitation Project($1.1M) <br /> DVWTP Polymer Mixing System Replacement($0.6M) <br /> 4 <br />