My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
101618
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2018 4:30:51 PM
Creation date
10/12/2018 4:30:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/16/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br /> E PMADgq <br /> P `le�` ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT,ZONE 7 <br /> �O� 57 100 NORTH CANYONS PARKWAY,LIVERMORE,CA 94551-9486 • PHONE(925)454-5000 <br /> 19 <br /> o�0 <br /> 9A <br /> 4 � <br /> R <br /> 0,, iL000 QQ ' <br /> ORIGINATING SECTION:ADMINISTRATION <br /> CONTACT:Osborn Solitei <br /> AGENDA DATE: October 17, 2018 ITEM NO. 9 <br /> SUBJECT: Treated Water Rates for Calendar Years 2019-2022 <br /> SUMMARY: <br /> • In 2015, Zone 7 hired Raftelis to prepare a Wholesale Water Rate Study to determine treated water <br /> rates for Calendar Years 2016,2017 and 2018. <br /> • Calendar Year 2018 is the last year of the adopted rate schedule. Zone 7 has hired Raftelis to conduct <br /> another Wholesale Water Rate Study to determine a four-year rate schedule for Calendar Years 2019, <br /> 2020,2021 and 2022. There is separate process for determining untreated water rates. <br /> • On September 5,2018, staff presented four rate scenarios at a Board Workshop on Water Rates. <br /> • On September 19, 2018 staff presented two additional rate scenarios which included funding for <br /> water supply reliability projects ranging from$9M to$15.2M through FY 2021-22. <br /> • Staff has taken a closer look at the proposed funding of future water supply reliability projects and <br /> recommends reducing the amount to$3M over the next four years until more information is available. <br /> • Staff also recommends funding the Operating, Emergency and Drought Contingency reserves at <br /> target levels and leave the Rate Stabilization Reserve unfunded during this study period. While this is <br /> a reasonable approach to reduce customer impacts, it's recommended that the Agency fund water <br /> supply reliability projects in the future and also review the current reserve policy based on industry <br /> standards and practices. <br /> • Staff has prepared to two additional rate scenarios for the Board's consideration. Staff recommends <br /> Scenario 1 -(3%CPI +$3M for Water Supply Reliability Projects+Fully Funding Three Reserves at <br /> Target Levels+3.7%Rate Adjustments). <br /> • Staff recommends that the Board adopt a four-year rate schedule with target levels met in four years, <br /> however the Board reserves the right to adopt a different rate schedule(i.e.,2 or 3 years). <br /> FUNDING: <br /> Treated Water Sales revenue accrues to Fund 100—Water Enterprise and provides capital funding to <br /> Fund 120—Renewal, Replacement and System-Wide Improvements. <br /> RECOMMENDED ACTION: <br /> Adopt the attached resolution approving treated water rates for calendar years 2019-2022. <br /> BACKGROUND: <br /> On September 19, 2018 staff presented two additional rate scenarios which included funding for water <br /> supply reliability projects ranging from $9M to $15.2M through FY 2021-22. Staff has taken a closer <br /> look at the proposed funding of future water supply reliability projects and recommends reducing the <br /> amount to $3M over the next four years until more information is available. Staff also recommends <br /> funding the Operating, Emergency and Drought Contingency reserves at target levels and leave the Rate <br />
The URL can be used to link to this page
Your browser does not support the video tag.