My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
090418
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 2:23:28 PM
Creation date
8/24/2018 4:14:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/4/2018
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Development Impact Fee Nexus Study <br /> Draft Appendix A 07/12/18 <br /> Table A-1 Signalized Intersection LOS Criteria <br /> Level of Service Description Delay in <br /> Seconds <br /> A Operations with very low delay occurring with favorable progression < 10.0 <br /> and/or short cycle lengths. <br /> e Operations with low delay occurring with good progression and/or short > 10.0 to 20.0 <br /> cycle lengths. <br /> Operations with average delays resulting from fair progression and/or > 20.0 to 35.0 <br /> longer cycle lengths. Individual cycle failures begin to appear. <br /> Operations with longer delays due to a combination of unfavorable <br /> D progression, long cycle lengths,and high volume-to-capacity(V/C) ratios. > 35.0 to 55.0 <br /> Many vehicles stop and individual cycle failures are noticeable. <br /> Operations with high delay values indicating poor progression, long cycle <br /> E lengths,and high V/C ratios. Individual cycle failures are frequent > 55.0 to 80.0 <br /> occurrences. <br /> F Operations with delays unacceptable to most drivers occurring due to > 80.0 <br /> over-saturation, poor progression,or very long cycle lengths. <br /> Source:2000 Highway Capacity Manual. <br /> Unsignalized Intersections <br /> The level of service method identified by the City of Pleasanton General Plan for unsignalized <br /> intersections is the method described in the HCM 2000. This method bases unsignalized <br /> intersection operations on the vehicular control delay. The City of Pleasanton General Plan <br /> applies LOS D as the performance standard at most intersections. <br /> Control delay includes initial deceleration delay, queue move-up time, stopped delay, <br /> acceleration delay. The control delay for unsignalized intersections is calculated using the <br /> Synchro 9 analysis software and is correlated to a LOS designation as shown in Table A-2. For <br /> side-street stop controlled intersections, the delay of the worst approach is recorded as the <br /> result. For all-way stop controlled intersections, the whole-intersection average delay is recorded <br /> as the result. <br /> Economic& Planning Systems, Inc. A-2 P:\151000s\151111PleasantonFee\Report1151111_FeeNexus 071118.docz <br />
The URL can be used to link to this page
Your browser does not support the video tag.