Laserfiche WebLink
Pleasanton Development Impact Fee Nexus Study <br /> Draft Report 07/12/18 <br /> New Parks and Recreation <br /> This analysis assumes a number of new parks and facilities will need to be acquired and <br /> improved though buildout. First, the new Civic Center is envisioned to include a new park and <br /> amphitheater with the cost of $14.1 million with contingency (or $10.9 million before <br /> contingency), as shown on Table 10. In addition, acquisition and improvement of six other park <br /> facilities is envisioned, as shown in Table 11. The City staff estimates the cost to acquire and <br /> improve these recreation facilities at $153.4 million including contingency. <br /> Table 10 Civic Center Park and Amphitheater Cost Estimates <br /> Item Area (sq.ft.) Cost per Sq.Ft. Total <br /> Pedestrian Paving 493,000 $9 $4,576,026 <br /> Landscaping 201,309 $9 $1,724,816 <br /> Bocce Courts $48,000 <br /> Site Structures (Incl Amphitheater) $1,551,000 <br /> Lighting 989,709 $1 $1,413,304 <br /> Site Prep <br /> (assume 25% of <br /> total project site <br /> prep) 294,000 $1 $209,916 <br /> Contractor Mark-ups @ 14.25% $1,357,036 <br /> Total $10,880,098 <br /> Table 11 New Parks and Recreation Improvements Allocated to New Development* <br /> Item Improvement(1) Total <br /> Bernal Community Park-Phase 3 Construct ballfield&parking $2,800,000 <br /> East Pleasanton Acquire land and construct a 38-acre park $64,600,000 <br /> Vineyard Corridor Acquire land and construct a 20-acre park $34,000,000 <br /> Alviso Adobe(Adjacent to Austin Property) Construct a 6-acre park $4,200,000 <br /> Callippe Trails $500,000 <br /> Staples Ranch Community Park Construct 17-acre community park $11,900,000 <br /> Subtotal $118,000,000 <br /> Contingency(2) $35,400,000 <br /> GRAND TOTAL $153,400,000 <br /> *Note: rounded. <br /> (1)Park acquisition cost of$1.0 million per acre and improvement cost of$700,000 per acre is provided by the City. <br /> (2)Include 15%conceptual planning level cost contingency, 10%design/engineering contingency, 5%combined <br /> permits,fees, FF&Es, and project management contingency. <br /> Sources:City of Pleasanton and Economic&Planning Systems, Inc. <br /> Economic&Planning Systems, Inc. 14 P:1151000s1151111PleasantonFeelRepOrt1151111_FeeNexus_071218.docx <br />