3.City of Pleasanton
<br /> Applies
<br /> to new or
<br /> existing Objectives Support Estimated
<br /> assets ! Hazards Miti•ated Met Lead A•enc A•enc Cost Sources of Fundin• Timeline
<br /> P-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:update and
<br /> implementation of the Climate Action Plan and update the General Plan to address recent legislation and establish policies related to
<br /> climate change adaptability.
<br /> New and Dam failure,Drought, 1,2,5,7, City of Pleasanton-All Adjacent Low Staff Time, General Short-term
<br /> Existing Flood,Landslide,Severe 8,9, 10, 12 Departments cities/County Funds
<br /> weather,Wildfire
<br /> P-6—Tie public education on defensible space and a comprehensive defensible space ordinance to a field program of enforcement.
<br /> New and Wildfire 1,2,5,6, LPFD City of Medium Staff Time,General Ongoing
<br /> Existing 11, 12 Pleasanton Funds
<br /> P7—Prohibit construction of habitable structures within at least 50 feet of an identified active fault trace where the fault has been
<br /> specifically located in site-specific geologic studies
<br /> New Landslide, Earthquake 2,4,5,6, City of Pleasanton None Low General Funds, Ongoing
<br /> 11 Community Development Staff Time
<br /> Department,Engineering
<br /> Department
<br /> P8—Prohibit new development of sites with structures intended for human occupancy in any landslide-prone areas unless the landslide
<br /> risk can be eliminated.Permit development in landslide prone areas only when sites can be shown to be stable during adverse conditions
<br /> such as saturated soils,ground shaking,and during grading of the site for roads,installation of infrastructure,and creation of building
<br /> pads. Engineering studies shall demonstrate that structures in landslide prone areas would sustain no more damage due to slope
<br /> instabilities than damage sustained by a similar building in the Pleasanton Planning Area constructed to current CBC standards and
<br /> located on soils with a low susceptibility to failure when exposed to moderate ground shaking.
<br /> New Landslide, Earthquake 2,4,5,6, City of Pleasanton None Low General Funds, Ongoing
<br /> 11 Community Development Staff Time
<br /> Department,Engineering
<br /> Department
<br /> P9—Require fire mitigation measures in new and existing developments that reduce the fire threat to the structure and occupants.
<br /> Require development outside the five-minute travel time and in Special Fire Protection Areas to provide effective fire prevention
<br /> measures.
<br /> New Wildfire 2, 3,7 LPFD City of Medium General Funds, Ongoing
<br /> Pleasanton Staff Time,Private
<br /> Development
<br /> Investment
<br /> P10—Continue to conduct public meetings and issue press releases regarding Del Valle Dam evacuation.
<br /> Existing Dam failure 3,7,9 City of Pleasanton None Low General Funds Ongoing
<br /> Community Development
<br /> Department,Engineering
<br /> Department
<br /> P11—Encourage replacing aboveground electric and phone wires and other structures with underground facilities,and use the planning-
<br /> approval process to ensure that,on a case-by-case basis,all new phone and electrical lines are installed underground.
<br /> New and Severe weather, 4,8 City of Pleasanton None Low General Funds; Ongoing
<br /> Existing Landslide,dam failure, Community Development Possible PG&E
<br /> flood,wildfire Underground Fund;
<br /> HMGP, PDM
<br /> TETRA TECH
<br /> 3-13