Tri-Valley Local Hazard Mitigation Plan;Volume 2—Planning Partner Annexes
<br /> Table 3-12. Status of Previous Plan Actions
<br /> Carried Over to
<br /> Removed; Plan Update
<br /> No Longer Check if Enter
<br /> Action Item Completed Feasible Yes Action#
<br /> Tie public education on defensible space and a comprehensive defensible Yes;Ongoing Yes P6
<br /> space ordinance to a field program of enforcement.LPFD Fire Prevention.
<br /> Resource shortage.(HSNG-g-2)
<br /> Comment: This is completed annually.
<br /> Install micro andlor surveillance cameras around critical public assets tied to No Yes No
<br /> web-based software,and develop a surveillance protocol to monitor these
<br /> cameras.Pleasanton Police Dept.,(GOVT-a-6).
<br /> Comment: Unfunded,
<br /> Ongoing Activities X
<br /> Comment: The 2010 plan included an extensive list of ongoing activities as part of the mitigation strategy.Based upon review, these
<br /> strategies are addressed by the objectives identified as part of this plan update and/or are identified in the core capability
<br /> assessment for the City of Pleasanton.
<br /> Table 3-13. Hazard Miti•ation Action Plan Matrix
<br /> Applies
<br /> to new or
<br /> existing Objectives Support Estimated
<br /> assets ! Hazards Mitigated Met Lead Agency Agency Cost Sources of Funding Timeline
<br /> P-1—Where appropriate,support retrofitting or relocation of structures in high hazard areas,prioritizing structures that have experienced
<br /> repetitive losses.
<br /> Existing Dam failure, Earthquake, 4,6,8, 10, City of Pleasanton, LPFD High HMGP, PDM,FMA Short-term
<br /> Flood,Landslide,Severe 11, 12 Community Development
<br /> weather,Wildfire Department,Engineering
<br /> Department
<br /> P-2—Integrate the hazard mitigation plan into other plans,ordinances and programs that dictate land use decisions in the community,
<br /> including the City's General Plan.
<br /> New and Dam failure, Drought, 1,2,6,8, City of Pleasanton, LPFD Low Staff Time,General Ongoing
<br /> Existing Earthquake,Flood, 10, 11 Community Development Funds
<br /> Landslide,Severe Department,Engineering
<br /> weather,Wildfire Department
<br /> P-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
<br /> New and Dam failure,Drought, 1,2,3,4, City of Pleasanton-All LPFD Low Staff Time,General Short-term
<br /> Existing Earthquake, Flood, 5,6,7,8, Departments Funds
<br /> Landslide,Severe 9, 10, 11,
<br /> weather,Wildfire 12
<br /> P-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs
<br /> that,at a minimum,meet the NFIP requirements:
<br /> • Enforce the flood damage prevention ordinance.
<br /> • Participate in floodplain identification and mapping updates.
<br /> • Provide public assistance/information on floodplain requirements and impacts.
<br /> New and Flood,Dam failure 1,4,6,9 City of Pleasanton, LPFD Low Staff Time,General Ongoing
<br /> Existing Engineering Department Funds
<br /> 3-1 2 TETRA TECH