Inc. of Brentwood, California, in the amount of $1,990,000, which is approximately 24 <br /> percent higher than the architect's estimate. Due to the number of bids received, Staff <br /> believes this pricing represents the current construction environment in the Bay Area, <br /> which is heavily affected by the natural disasters within the State of California in 2017. <br /> All other bid documents were found to be in order and past work performed by Saboo, <br /> Inc. was verified to be satisfactory. Staff recommends award of the construction contract <br /> to Saboo, Inc. at $1,990,000 for the base bid and the bid additive. <br /> Contingency <br /> Staff recommends that the contingency amount for this project be $99,985, or <br /> approximately five percent of the construction contract for work. This amount should be <br /> sufficient to cover any unforeseen work that is discovered during demolition activities <br /> which include removal of the concrete floors within the existing building. <br /> Professional Services <br /> Geotechnical testing, material testing and specialty inspection services will be <br /> necessary to test backfill materials, compaction and perform specialty inspections, if <br /> needed. A task authorization will be issued for up to a not-to-exceed amount of $12,000 <br /> under the existing on-call contract the City has with ENGEO, Inc. <br /> Arch-Pac's scope of work includes construction support services. Arch-Pac will provide <br /> periodic site visits and will review shop drawings and RFI submittals. They will also <br /> provide punch list items at the pre-final walk at the end of the project. This work was <br /> already budgeted when the design contract was awarded in May 2017. <br /> Due to staff workload, it may be necessary to hire a project management consultant for <br /> this project. If necessary, one of the existing on-call consultants will be issued an <br /> authorization for a not-to-exceed amount. This agreement is yet to be negotiated, <br /> however the proposed budget includes $100,000 for this purpose. <br /> Budget <br /> The total anticipated expenditure for the project is $2,304,000, including the <br /> construction contract amount, professional services, material testing and inspections, <br /> and contingency. A total of $1,200,000 has been allocated for the project, leaving a <br /> project shortfall of $1,004,000. Staff recommends the reallocation of $50,000 from the <br /> Repair and Replacement Fund for the HVAC work, and an appropriation of $1,054,000 <br /> from the CIP General Fund Reserve to fully fund the project. A project funding and <br /> estimated expenditure summary is included as Attachment 3. <br /> Schedule <br /> The contractor is anticipated to begin work in the mechanical rooms and on the "on- <br /> deck" showers this summer. The contractor is also working with the City to determine <br /> the best date to begin work in the locker room facilities. It is anticipated that this work <br /> will be begin sometime in August. At the time of the locker room closure, bathrooms and <br /> showers will be limited to a contractor-supplied portable shower/toilet trailer setup and <br /> the bathrooms from adjacent public buildings. There will be no locker rooms available <br /> for changing during construction. The contract has a strict deadline for reopening the <br /> Page 3 of 4 <br />