My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
051518
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 3:57:40 PM
Creation date
5/10/2018 11:03:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/15/2018
DESTRUCT DATE
15Y
Document Relationships
17 ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2018\051518
17 ATTACHMENTS 4-5-6-7-8
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2018\051518
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41. The applicant shall install a new sewer manhole where the new 8-inch diameter sewer <br /> main connects to the existing city sewer main along Santa Rita Road. This shall be <br /> depicted in the plans submitted for issuance of a building permit and is subject to review <br /> and approval by the City Engineer. <br /> 42. The applicant shall install catch basin inserts (5 millimeter mesh screens) for trash <br /> capture, approved by the State Water Resources Control Board, on all bioswale <br /> overflow outlet risers. This shall be depicted in the plans submitted for issuance of a <br /> building permit and is subject to review and approval by the City Engineer. <br /> 43. The applicant shall abandon all unused utility stubs in compliance with the latest City <br /> standards. This shall be depicted in the plans submitted for issuance of a building <br /> permit and is subject to review and approval by the City Engineer. <br /> 44. The applicant shall submit potable water, storm sewer, and sanitary sewer demand <br /> calculations to the City for review and acceptance. The calculations shall be provided <br /> with the plans submitted for issuance of a building permit and is subject to review and <br /> approval by the City Engineer. <br /> 45. The applicant shall repair the uneven sidewalk at the three locations located along the <br /> project frontage. The locations include a Pacific Bell Utility Box near an existing fire <br /> hydrant, uplifted sidewalk near the north side of southernmost driveway, and uplifted <br /> sidewalk near a street tree. This shall be depicted in the plans submitted for issuance of <br /> a building permit and is subject to review and approval by the City Engineer. <br /> 46. The applicant shall install one tree per tree well within the two existing tree wells that <br /> are missing trees along the sidewalk fronting the property. The size and species of the <br /> trees shall be subject to the City Landscape Architect's review and approval. This shall <br /> be depicted in the plans submitted for issuance of a building permit and is subject to <br /> review and approval by the City Engineer. <br /> STANDARD CONDITIONS OF APPROVAL <br /> Planning Division <br /> 47. The PUD development plan approval shall lapse two years from the effective date of <br /> approval unless a building permit is obtained and construction diligently pursued, or the <br /> City has approved a time extension. <br /> 48. The applicant shall implement the measures identified in the U.S. Green Building <br /> Council's (USGBC), "Leadership in Energy and Environmental Design (LEED)" rating <br /> system to achieve a "certified rating" in the design, construction, and operation of the <br /> project. The green building measures shall be shown on plans submitted to the Building <br /> and Safety Division for issuance of a building permit. Each point identified shall have a <br /> notation indicating the sheet where the point can be found, and each sheet shall note <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 9 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.