is based on providing a full-time inspector/resident engineer for 60 working days <br /> as-needed during heavy construction activities. CM was selected for the on-call <br /> work through a Request for Qualifications process. <br /> • Survey Services: Existing survey monuments, by law, must be protected during <br /> construction. However, this project has the potential to disturb or damage a large <br /> number of monuments during construction. To ensure monuments are not <br /> disturbed or can be replaced if damaged, they must be "tied-out" by a licensed <br /> land surveyor prior to construction. In short, "tied-out" means locating the <br /> horizontal and vertical location of each monument in relation to four points that <br /> are set outside the area of disturbance. This allows the surveyor to verify the <br /> location of each monument and adjust/replace it if necessary after construction. <br /> Alexander &Associates, Inc. was selected to perform the required work. <br /> Alexander &Associates has provided survey services during the design phase <br /> and is familiar with the downtown area. Staff is recommending that Alexander & <br /> Associates be retained for a not-to-exceed amount of$42,000. The authorized <br /> amount is based on providing services for setting the tie points, verifying the <br /> locations, setting new monuments if necessary, and filing the required corner <br /> record with the County Surveyor for each new monument set. Although we are <br /> estimating a not-to-exceed amount of$42,000, payment will be based upon <br /> actual work. Assuming few monuments are damaged and require filing of corner <br /> records, payment will likely be less. Alexander and Associates were selected <br /> through a Request for Qualifications process. <br /> • Geotechnical & Material Testing Services: Consultant testing services for <br /> $20,000 will be provided under the existing on-call materials testing contracts. <br /> The testing services will be in conformance with the City's Quality Assurance <br /> Program for paving. On-call material testing firms were also selected through a <br /> Request for Qualifications process. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract: 04/17/2018 <br /> Start of Construction: 05/14/2018 <br /> End of Construction: 08/31/2018 <br /> Submitted by: Fiscal Review: Approved y: <br /> //7/- <br /> Stephen Ki trick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Estimated Expenditure Summary <br /> 2. Bid Summary <br /> 3. Alexander &Associates proposal <br /> 4. Carlson Management proposal <br /> Page 5 of 5 <br />