My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
041718
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:43:04 PM
Creation date
4/12/2018 3:43:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/17/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
overall project are to be taken and a set included in the final project <br /> records. <br /> j. Design Clarification — CONSULTANT will coordinate design clarifications <br /> with CITY as appropriate. CONSULTANT shall maintain a log to track <br /> processing of design clarifications. <br /> 3. CONSTRUCTION SURVEYING <br /> CONSULTANT will review staking requests submitted by Contractors' and <br /> coordinate staking with CITY'S construction staking firm. <br /> 4. INSPECTION AND TESTING <br /> CONSULTANT shall: <br /> a. Provide construction inspection in accordance with Caltrans and CITY <br /> procedures for all project items. <br /> b. Coordinate the activities of testing laboratories, surveyors and inspectors, <br /> representatives from utility companies and the administration of all project <br /> permits and utility relocations. Quality assurance testing will be by CITY'S <br /> materials testing firm. <br /> c. Coordinate with local residents, proprietors, and land owners to minimize <br /> impact of construction on said parties. <br /> d. Act as single point of contact for project inquiries and coordinate press <br /> releases as appropriate <br /> e. Review and coordinate with designer of record, affected business, and <br /> City of Pleasanton contractor's proposed detours and lane closures. <br /> f. Enforce labor regulations as included in contract specifications. <br /> g. Maintain an up-to-date set of plans and specifications at the job site. <br /> h. Review all certificates of inspections and tests. <br /> i. Provide final inspection and punch list. <br /> j. Collect and check record drawing information as furnished by the <br /> Contractor, furnish information to the designer for preparation of record <br /> drawings. <br /> Consulting Services Agreement between XXXXX <br /> City of Pleasanton and Carlson Management, Inc. Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.