Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br /> <br /> Carryovers from FY002-03 <br /> <br />o25Ol6 Suno] Blvd Reconstruction (or Widening): Junipero to 1-680 Phase I 390,893 0 0 0 0 0 0 0 390,8! <br />025019 Foothill at Muitwood Dr. South: Street AlignmentNew Traffic Signal 20,000 0 166,884 0 0 97,000 0 0 283,8l <br /> Vineyard Corridor Infrastructure Improvements Phase 1 - Joint City PUSD <br />025022 Escrow Fund 0 0 0 0 0 0 0 0 <br /> Dougheny Valley Mitigation Revenue Reserve (Recommended funding is in <br />o25023 addition to an existing reserve of $50,000) 237,900 0 0 0 0 0 0 0 237,9( <br />025o3o Foothill Road Improvements, South &Oak Creek Drive 6,000 0 44,000 0 0 0 0 0 50,0( <br />025039 Traffic Signal at Pleasanton Ave and Berne[ 0 0 0 124,472 0 0 0 0 t 24,4~ <br />o25o4o Traffic Signal at West Las Positas and Dorman 0 0 0 124,472 0 0 0 0 124,4~ <br />025041 Traffic Si,gnal at Vineyard and Montevino 9 [ ,594 0 0 0 0 0 0 0 91,5! <br />025042 Bemal St Improvements at Valley 8,450 0 0 24,500 0 0 0 0 32,9~ <br />o25o55 Neighborhood Traffic Calming Devices 49,123 100 0 0 0 0 0 0 49,2; <br /> First and Kottinger Undergrounding for Street Lights and Laterals <br />o25o71 (Recommended funding is in addition to a project reserve of $50,000) 50,000 0 0 0 0 0 0 0 50,01 <br />035oo3 Annual Resurfacing &Various Streets 0 0 0 0 0 0 0 0 <br />o35oo4 Annual Slurry Sealing of Various Streets 0 0 0 0 0 0 0 0 <br />o350o5 Annual Sidewalk and Intersection Ramp Installations 0 0 ! 0 0 0 0 0 0 <br />0350o6 Happy Valley Bypass Road <br />035oo? Annual Traffic Buttons and Line Markers Installation 0 0 0 0 0 0 0 0 <br />0350o9 Annual Curb and Gutter Replacements for Street Resurfacinl~ prOJects 0 0 0 0 0 0 0 0 <br />035012 Annual Sidewalk Maintenance 0 0: 0 0 0 0 0 0 <br />035m9 Curb and Gutter Replacement and Street Resuffacin~ of Haleakala Court 0 0 0 0 0 0 0 0 <br /> Hacienda Drive ~ Owens Drive: Reconfigure Intersection and Upgrade <br />035020 Traffic Signal 0 0 0 0 0 0 0 0 <br />035021 Evaluation and Reclassification of Street Surfaces 0 0 0 0 0 0 0 0 <br /> Sunol Bird Reconstruction (or Widening): Junipero to 1-680 Phase Il <br />035022 (Reserve) 0 0 0 0 0 0 0 0 <br />035055 Neighborhood Traffic Calming Devices 0 0 0 0 0 0 0 0 <br />045054 Installation of New Traffice Signals at Various Locations 0 0 0 0 0 0 0 0 <br />800014 Stoneridge Dr Specific Plan Study 0 0 0 0 I 0 0 263,605 0 263,61 <br />8050o8 Signal - Main (~ Vervais - Reimburse Developer 203 0 0 0 <br />805011 Peoplesoa Reimbursement- Traffic Equipment 0 0 0 0 0 0 0 0 <br />sosol2 Vineyard ~ Ruby Hill - Traffic Equipment 0 0 0 0 I 0 0 0 0 <br />805014 Right of Way Transfer to Caltrans (NPID3) 0 0 0 0: 0 0 0 78,207 78,21 <br />80501 s Traffic Signal at Bernal & Tawny <br />935o3o Extension of Livingston Way 0 0 0 0 I 0 0 12,000 0 12,01 <br /> Arroyo de la Laguna Imp; Removal of old Bernal Bridge Foundation <br />935o~5 (Recommended fianding is in addition to existing reserve of $125,000) 93,583 1,563 I 0 0 0 0 0 0 95, <br />955029 First St Bridge at Arroyo Del Valle; Interim Improve (IS3'EA/HBRR) 23,445 00 i 0 0 0 0 0 0 23,4, <br />965021 Bridge Painting (1996-97) 45,000 0 0 0 0 0 0 45,0{ <br /> <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br />0 <br /> <br />0 <br />0 <br />0 <br /> <br />0 <br />0 <br /> <br />0 <br /> <br />B - STREETS - 7 Streets Q I 04 Final with Page Breaks.×ls 1/912004 3:04 PM <br /> <br /> <br />