My WebLink
|
Help
|
About
|
Sign Out
ORD 2174
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:26 PM
Creation date
2/26/2018 9:26:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
2/6/2018
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> approved landscape plan. Said agreement shall be recorded and run with the land for the <br /> duration of the existence of the structures located on the subject property. <br /> 51. The applicant shall provide root control barriers at the back of pavement and four-inch <br /> perforated pipe for parking lot trees, street trees, and trees in planting areas less than <br /> ten-feet in width, as determined necessary by the City Landscape Architect. Root barriers <br /> shall extend a minimum of five feet in each direction from the center of the trunk. <br /> Information and details shall be included in the landscape plan submittal for review and <br /> approval by the Landscape Architecture Division. <br /> 52. All site lighting shall be dark sky compliant. <br /> Engineering Department <br /> 53. A "Conditions of Approval" checklist shall be completed and attached to all plan checks <br /> submitted for approval indicating that all conditions have been satisfied. <br /> 54. The applicant shall submit a refundable cash deposit for hazard and erosion control. The <br /> amount of this bond will be determined by the Director of Community Development. The <br /> cash bond will be retained by the City until all the permanent landscaping is installed for <br /> the development, including individual lots, unless otherwise approved by the department. <br /> 55. The project developer shall comply with the recommendations of the project's <br /> geotechnical consultant. The project developer's geotechnical consultant shall review <br /> and approve all foundation, retaining wall, and drainage geotechnical aspects of the final <br /> development plans to ensure that the recommendations have been properly <br /> incorporated into the development. The consultant shall certify by writing on the plans or <br /> as otherwise acceptable to the City Engineer that the final development plan is in <br /> conformance with the geotechnical report approved with the project. <br /> 56. The project developer shall arrange and pay for the geotechnical consultant to inspect <br /> and approve all foundation, retaining, and wall and drainage geotechnical aspects of <br /> project construction. The consultant shall be present on site during grading and <br /> excavation operations. The results of the inspections and the as-built conditions of the <br /> project shall be certified in writing by the geotechnical consultant for conformance to the <br /> approved plans and geotechnical report and submitted to the City Engineer for review <br /> and approval prior to occupancy. <br /> 57. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of a permit, and shall address the need to schedule <br /> major truck trips and deliveries during off peak travel times, to avoid peak travel <br /> congestion. It shall also include the provision to monitor the street surfaces used for the <br /> haul route so that any damage and debris attributable to the haul trucks is identified and <br /> corrected at the expense of the project applicant or developer. <br /> 58. All dry utilities (electric power distribution, gas distribution, communication service, Cable <br /> television, street lights and any required alarm systems) required to serve existing or <br /> new development shall be installed in conduit, underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.