Laserfiche WebLink
AI EACH\IHN1 3 <br /> DESCRIPTION OF STONERIDGE DRIVE AND I-680 PROJECT <br /> This construction improvement is outlined in DSE1R/FSEIR (see these documents for more <br /> detail)and includes the widening of the Stoneridge Drive and the I-680 On-ramp (Mitigation <br /> 4.D-1d).These improvements are partially within Caltrans ROW and will require Caltrans <br /> approval. The City has prepared exhibits,preliminary design and cost estimates to support <br /> development of a request letter for Caltrans to approve improvements within State right of way <br /> through the streamlined Permit Engineering Evaluation Report(PEER)process. This work did <br /> not include preparation of final design plans which will be completed by Costco. <br /> Attachment 3 <br /> 1310 01 L218870.8 <br /> 2/7!2018 <br />