Schedule <br />The proposed schedule for the project is as follows: <br />Award of Design Contract <br />Start of Design <br />Start of Construction: <br />End of Construction: <br />February 6, 2018 <br />Spring/Summer 2018 <br />Fall 2018 <br />Spring/Summer 2019 <br />Design <br />Design of the project will be in close consultation with the Community Development <br />Department, and the businesses that are adjacent to this section of the transportation <br />corridor. As envisioned, the design concept will be presented at an advertised public <br />meeting at least once, and perhaps more depending on feedback received. <br />Submitted by: <br />Stephen Iiykpatrick <br />Director o Engineering <br />Fiscal Review: <br />Tina Olson <br />Director of Finance <br />Attachments: <br />1. HMH Engineering Scope and Fee <br />Page 3 of 3 <br />Approve <br />Nelson Fialho <br />City Manager <br />