My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:17:16 PM
Creation date
1/31/2018 1:30:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 7 <br />Exceptions and Assumptions <br />No Right -of -Way acquisition or appraisal services are included within this scope of services. <br />No easement vacation or resolution services are included within this scope of services. <br />It is assumed that a single, combined stormwater treatment and retaining wall concept will be <br />implemented as feasible. <br />No utility relocations are assumed within this scope of services. <br />Design of private utility facilities to be relocated by the project are excluded from this scope of <br />services. <br />Specifications will be prepared as a separate document than the plans. Specifications will <br />reference City of Pleasanton Standard Specifications and will be supplemented by applicable <br />specifications in CSI format. CITY will provide front-end general provisions for incorporation by <br />the consultant. <br />It is assumed the retaining wall in this scope of services will be designed using the AASHTO <br />LRFD 6th Edition with Caltrans Amendments. A concrete facing is assumed to be the final wall <br />facing incorporation either cast -in-place or shotcrete wall construction. <br />No environmental clearance or permitting services are included in this scope of services. <br />No preparation of a SWPPP is assumed within this scope of services. The Risk Level <br />Determination will be prepared within Task 165. <br />No separate demolition plan is assumed within this scope of services. <br />It is assumed that existing water services can be used for landscape irrigation. <br />It is assumed that existing PG&E services can be used for lighting and traffic signals. <br />No control or boundary survey is included in this work. CITY will provide right-of-way <br />information, plotted in AutoCAD, compliant with the CITY's CAD standards for use by the <br />consultant for design. The consultant shall be able to rely on the accuracy of the information <br />provided by CITY. <br />CITY will provide survey control monumentation used in the preparation of topographic survey. <br />CITY will provide topographic survey to the design professional which is accurate for the design <br />professional to rely upon for detailed grading calculations. The topographic survey provided will <br />include the raw survey data, in .txt format, along with AutoCAD linework, drafted compliant with <br />the City's CAD standards, which depict existing surface features including curbs, gutters, <br />drainage inlets, manholes, utility boxes, trees, sidewalk, asphalt, lane markings and other visible <br />surface features. The city will provide dip information depicting the depth, orientation and <br />diameter of all storm drain and sanitary sewer manholes within the project area. <br />No Traffic Control Plans will be prepared for soil boring operations on the project site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.