Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility'°'" "'v <br />Timing <br />Signature <br />Air Quality <br />AQ -2.1 Implement construction dust measures. The proposed project <br />Verify inclusion of dust <br />Verification of <br />Verification of <br />Signature <br />shall be required to implement the following mitigation measures during <br />control measures in <br />inclusion of control <br />inclusion of <br />all construction phases to reduce impacts associated with construction <br />construction plans and <br />specifications; field <br />measures: City of <br />Pleasanton Building <br />control measures: <br />Prior to issuance <br />Title <br />dust to the extent feasible, as determined by the City Engineer. These <br />inspections. <br />and Safety Division <br />of a grading or <br />Date <br />measures shall be incorporated into the construction documents describing <br />and/or Engineering <br />construction <br />procedures and specifications for contractors to follow. <br />Division. <br />permit. <br />Implementation: Each <br />• Water all active construction areas at least twice daily. <br />Project Developer for <br />• Cover all trucks hauling soil, sand, and other loose materials <br />its PUD site and <br />to or from the Project Area or require all trucks to maintain <br />related construction <br />at least two feet of freeboard. <br />activities to be <br />• Pave, apply water three times daily, or apply (non-toxic) soil <br />constructed by it perPUD conditions of <br />stabilizers on all unpaved access roads, parking areas and <br />approval, the <br />staging areas at construction sites. <br />Stoneridge Drive <br />• Sweep daily (with water sweepers) all paved access roads, <br />Specific Plan <br />parking areas and staging areas at construction sites. <br />Amendment, and/or <br />the Development <br />• Sweep streets daily (with water sweepers) if visible soil <br />Agreement; Project <br />material is carried onto adjacent public streets. <br />Sponsor for the <br />• Hydroseed or apply (non-toxic) soil stabilizers to inactive <br />bridge" and all <br />construction areas (previously graded areas inactive for ten <br />construction activities <br />to be constructed by it <br />days or more). <br />per the Stoneridge <br />• Enclose, cover, water twice daily or apply (non-toxic) soil <br />Drive Specific Plan <br />binders to exposed stockpiles (dirt, sand, etc.). <br />Amendment and/or the <br />• Limit traffic speeds on unpaved roads to 15 mph. <br />Development <br />• Install sandbags or other erosion control measures to prevent <br />Agreement. <br />silt runoff to public roadways. <br />Field inspections: <br />Field inspections: <br />• Replant vegetation in disturbed areas as quickly as possible. <br />City of Pleasanton <br />On-going during <br />• Suspend excavation and grading activities to the extent <br />Building and Safety <br />construction. <br />