Laserfiche WebLink
{end} <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom -sweep <br />the street pavement adjoining the project site on a daily basis. Scrape caked - <br />on mud and dirt from these areas before sweeping. <br />d. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br />e. Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br />f. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br />g. Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br />10 <br />