Laserfiche WebLink
the project developer. This shall include slurry seal, overlay, or street reconstruction <br />if deemed warranted by the City Engineer. <br />53. The project developer's contractor(s) shall obtain an encroachment permit from the <br />City Engineer prior to moving any construction equipment onto the site. <br />Urban Stormwater Design Requirements <br />54. The following requirements shall be incorporated into the project: <br />a. The project developer, present homeowner, and future homeowners of the <br />home covered by this approval are encouraged to use best management <br />practices for the use of pesticides and herbicides, similar to the integrated <br />pest management program used on the Callippe Preserve Golf Course. <br />b. Roof drains shall discharge and drain away from the building foundation to <br />an unpaved area wherever practicable. <br />Urban Stormwater Construction Requirements <br />55. The project developer shall submit a Stormwater Pollution Prevention Plan (SWPPP) <br />for review and approval by the City Engineer prior to issuance of building or grading <br />permits. Failure to comply with the approved construction SWPPP may result in the <br />issuance of correction notices, citations or stop work order. The following <br />construction Best Management Practices (BMPs), as well as any other applicable <br />measure, shall be included in the SWPPP and implemented as approved by the <br />City. <br />56. The project developer is responsible for implementing the following measures during <br />all construction phases of the project: <br />a. Include erosion control/storm water quality measures on the final grading plan <br />which shall specifically address measures to prevent soil, dirt, and debris from <br />entering the storm drain system or the adjoining golf course fairways. Such <br />measures may include, but are not limited to, hydroseeding, hay bales, <br />sandbags, and siltation fences and are subject to the review and approval of <br />the Chief Building Official. The project developer is responsible for ensuring <br />that the contractor is aware of and implements such measures. <br />b. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br />c. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />.01 <br />