My WebLink
|
Help
|
About
|
Sign Out
PC-2009-42, PUD-80, CITY OF PLEASANTON
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2009
>
PC-2009-42, PUD-80, CITY OF PLEASANTON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 3:43:17 PM
Creation date
12/28/2017 3:40:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/5/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2009-42
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o. Prior to the issuance of a building permit, the plans will be revised such that <br />the wildlife shelter and food plant species listed in the Forage and Shelter <br />Plant list in, Exhibit B of Case PUD -70 (Community Park) are incorporated <br />into the landscaping plans. The final plant list will be subject to the' review <br />and approval of the Director of Parks and Community Services prior to the <br />issuance of a building permit. <br />p. On page L-1 of Exhibit B, the first tree located closest to the southernmost <br />blue car will be relocated east, such that it does not create a line of sight <br />obstruction, as determined by the City Traffic Engineer. <br />7. Lighting. Prior to the issuance of a building permit, the plans will be revised and <br />the amount of lighting proposed by the tennis courts will be reduced such that the <br />foot candle level is approximately 40 as determined by the Director of Parks and <br />Community Services. <br />8. Noise. There will be no truck deliveries, parking lot sweeping, or leaf blowing between <br />the hours of 8:00 p.m. and 8:00 a.m. <br />9. Green Building. The green building project checklist will be reprinted as one of <br />the first two plan sheet(s) of the building permit plan check sets submitted for <br />review and approval. For each green building measure proposed, the checklist <br />will include information noting the page number in the plan set where the green <br />building measure is addressed. <br />a. The final green building project checklist will be on, at all times, all grading, <br />landscaping, and construction plans kept on the project site. <br />b. The total number of green building points to be achieved will exceed the <br />minimum number of points required on the checklist, as determined by the <br />Director of Parks and Community Services. <br />c. The restroom will be designed and constructed to accommodate future roof <br />mounted photovoltaic panels. Specifically, the roofs will be engineered to <br />accommodate the additional load of photovoltaic panels, electrical conduit(s) <br />will be installed from the roof/attic areas to each building's main electrical <br />panel, and a space will be provided for the electrical inverter. <br />d. Photovoltaic panels may be installed on the roof of the restroom without <br />additional Planning Division review if the panels are'flat mounted on the roof <br />and are black, blue, or an equivalent color. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.