My WebLink
|
Help
|
About
|
Sign Out
PC-2009-40, PUD-70, SAN JOSE ARENA MANAGEMENT
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2009
>
PC-2009-40, PUD-70, SAN JOSE ARENA MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 3:43:06 PM
Creation date
12/28/2017 3:37:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/5/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2009-40
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
used shall be shown on the plans, prior to the issuance of a building permit, <br />and shall be subject to the review and approval of the City Engineer. <br />j. Utilities to be owned and maintained by the City shall be located in a public <br />right of way or PSE with sufficient access for maintenance. The location and <br />width of a PSE shall be subject to the review and approval of the City <br />Engineer prior to the recordation of a Final Map for the PUD project site or <br />issuance of a building permit, whichever occurs first. <br />k. Prior to the issuance of a building permit, the plans shall be revised to show <br />separate private water mains to each building for fire sprinkler service. <br />I. A sanitary sewer sampling manhole shall be provided on any new sanitary <br />sewer lateral from a building with a commercial use, unless otherwise <br />determined by the City Engineer. <br />m. Prior to the issuance of a building permit, the Project Developer shall provide <br />a joint trench plan (PG&E, AT&T, & Comcast) including splice box, switch box <br />and transformer locations for the City's review and comment with the <br />improvement plan submittal. All utility boxes for PG&E, AT&T, Comcast and <br />similar utility companies shall be installed underground, unless the entire <br />development proposal on the property has been constructed in which case <br />aboveground boxes may be allowed subject to the approval of a PUD <br />modification. <br />n. If the site is subdivided, easement for utilities, cross drainage, shared vehicle <br />access, and shared parking may be required by the City Engineer and the <br />Principal Planner. <br />o. Stormwater treatment shall be required for all roof drainage. <br />11. Urban Stormwater Runoff. <br />a. All on site storm drain pipes and appurtenances shall be privately maintained. <br />These pipes shall be marked "private". The location of the markings shall be <br />subject to the review and approval of the City Engineer, prior to the issuance <br />of a building permit. <br />All on site stormwater shall be treated on site (as required by the conditions of <br />approval for this case) before entering the stormwater flow control basin in the <br />Neighborhood Park. <br />b. Surface level stormwater shall not be permitted to flow onto a property in a <br />different PUD. If surface level stormwater flows over property lines within the <br />same PUD, cross drainage easements shall be required prior to the <br />recordation of the Final Map for the new property. The location of the <br />easements shall be subject to the review and approval of the City Engineer. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.