Laserfiche WebLink
alternative fire protection methods shall not start without the approval of the Fire <br />Chief. Approval for the number, type, and location of fire hydrants shall be <br />subject to the approval of the Fire Chief and City Engineer. <br />25. All driveways and aisles designated as fire lanes by the Fire Chief shall be <br />maintained in accordance with Articles 9 and 10 of the Uniform Fire Code which <br />permit towing vehicles illegally parked on the fire lanes. Fire lane curbs shall be <br />painted red with "No Parking, Fire Lane, Tow Away Zone," or "No Parking, Fire <br />Lane, Tow Away Zone" signs shall be installed as required by the Vehicle Code. <br />26. The Fire. Chief shall issue a permit prior to any installation of a fire detection, <br />alarm, and occupant notification system. All sprinkler system water flow and <br />control valves shall be complete and serviceable prior to final inspection. Prior to <br />the occupancy of a building having a fire alarm system, the Fire Department shall <br />test and witness the operation of the fire alarm system. <br />27. All portions of the building covered by this approval shall have installed and <br />operating, fire extinguishers with a minimum 2-A:10-B:C rating. The fire <br />extinguishers shall be located within a seventy-five foot (75' 0") radius of each <br />other. <br />28. The haul route for all materials to and from this development shall be approved <br />by the City Engineer prior to the issuance of an encroachment permit. <br />29. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense <br />to the project developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br />30. The project developer's contractor(s) shall obtain an encroachment permit from <br />the City Engineer prior to moving any construction equipment onto the site and <br />hauling construction debris offsite. <br />{end} <br />El <br />