Laserfiche WebLink
plan for this development. Said agreement shall run with the land for the <br />duration of the existence of the structures located on the property. <br />Prior to occupancy, the landscape architect for the project shall certify in <br />writing to the Director of Community Development that the landscaping has <br />been installed in accordance with the approved landscape and irrigation <br />plans with respect to size, number, and species of plants and overall design. <br />6. Construction Requirements. <br />a. The property owner shall be responsible for conducting sonic vermin control <br />immediately prior to and during grading and construction. The details of the <br />sonic rodent control measures, including the location of the sonic devices <br />shall be submitted to and subject to the review and approval of the Principal <br />Planner prior to the issuance of a grading permit or building permit, <br />whichever is sooner. The approved measures shall be included in the plan <br />sets submitted for the issuance of a grading permit and the plans submitted <br />for the issuance of a building permit. <br />b. Dust and mud shall be contained within the boundaries of the property <br />during times of construction. The project developer shall submit a dust <br />control plan or procedure as part of the building permit plans. <br />C. Portable toilets used during construction shall be emptied on a regular basis <br />as necessary to prevent odor. <br />d. Construction trailers shall be allowed to be placed on the project site for <br />daily administration/coordination purposes during the construction period. <br />At no time shall campers, trailers, motor homes, or any other vehicle be <br />used as living or sleeping quarters on the construction site. All such <br />vehicles shall be removed from the site at the end of each workday. <br />e. Any damage to existing street or sidewalk improvements during construction <br />on the subject property shall be repaired to the satisfaction of the City <br />Engineer at full expense to the developer. This shall include slurry seal, <br />overlay, or street reconstruction if deemed warranted by the City Engineer. <br />7. Phasing. Phase I—Infrastructure Improvements for the Staples Ranch Site. Prior <br />to occupancy of any building on site: <br />a. The stormwater flow control basin in the Neighborhood Park shall be <br />constructed and operational as determined by the City Engineer. <br />b. The Stoneridge Drive extension from Trevor Parkway to EI Charro Road <br />shall be constructed and operational, as determined by the City Traffic <br />Engineer. <br />c. The ACSPA shall replace the existing 8 inch water line in Staples Ranch <br />Drive between Vermont place and the senior continuing care community site <br />(PUD -68) site with a new 12 inch water line. Prior to occupancy, the <br />ACSPA shall reconnect all existing house water service connections along <br />Staples Ranch Drive to this new water main. The location of the new line, <br />5 <br />