My WebLink
|
Help
|
About
|
Sign Out
PC-2009-17, PUD-57, HENDRICK AUTOMOTIVE GROUP
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2009
>
PC-2009-17, PUD-57, HENDRICK AUTOMOTIVE GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 3:00:45 PM
Creation date
12/28/2017 2:57:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2009-17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
issuance of a building permit, the project developer shall revise the plans and draw <br />the APA line on the site plan. <br />5. Prior to occupancy, the property owner shall meet with the Fire Marshal, or his or <br />her designee, about the Del Valle Dam evacuation system, in the event of flooding. <br />The property owner shall provide information from the Fire Marshal to all future <br />tenants, on-site managers, and future property owners. <br />Building and Safety Division and Engineering Division <br />6. All construction activities shall comply with any City of Pleasanton Construction <br />and Demolition Ordinance effective at the time of building permit issuance. <br />7. The building(s) shall meet the applicable Title 24 state energy requirements. <br />8. The project shall be subject to the City's Green Building Ordinance, Chapter 17.50 <br />of the Pleasanton Municipal Code. <br />9. The green building project checklist shall be subject to the review and approval of <br />the Green Building Compliance Official and the Building and Safety Division prior <br />to the issuance of a building permit. <br />10. During construction prior approval from the Green Building Compliance Official <br />must be received before any changes are constituted to the green building project <br />checklist. <br />11. The applicant's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site or City right of <br />way. <br />12. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building and Safety Division will issue permits. <br />13. The applicants shall obtain all building and other applicable City permits for the <br />project prior to the commencement of construction. <br />14. The applicants shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the <br />Municipal Code of the City of Pleasanton. These plans shall be approved by the <br />Chief Building Official prior to the issuance of a building permit. The site <br />development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br />site development plan necessary to construct the improvements are to be in <br />accordance with the City of Pleasanton Private Development Design Guidelines <br />adopted April 15, 1986. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.