Laserfiche WebLink
map for any water meters (irrigation meters) not directly related to a <br />building permit. <br />27. Prior to the first plan check, the applicant's engineer/surveyor shall submit <br />a preliminary copy of the Final Map or Parcel Map (whichever is applicable) <br />along with a preliminary copy of the title report and a copy of the adjoining <br />deeds and/or recorded maps to the City. The City will forward these <br />documents to its consultant who will estimate the cost for examining the <br />map and certifying that the map is technically correct and in accordance <br />with Section 66442 of the California Subdivision Map Act. After the <br />consultant has provided a cost estimate, the applicant's engineer/surveyor <br />may submit the first plan check along with a deposit for these costs along <br />with all other standard plan check fees. Any unused portion of the estimate <br />will be returned to the applicant after the map is recorded. Similarly, if the <br />applicant withdraws their application in writing prior to the consultant having <br />performed the work, any unused portion of the deposit will be returned to <br />the applicant. Conversely, should the consultant's estimate be insufficient <br />to cover all of the consultant's time, the applicant will be required to pay the <br />City the difference between the estimate and the actual cost prior to <br />submittal of the map for the City Engineer's approval. <br />28. The applicant shall record the final parcel map (and any required separate <br />documents) with the Alameda County Recorder's Office. <br />29. The applicant shall provide the City with a legible copy of the recorded <br />parcel map with all recording data shown. <br />{end) <br />Ell <br />