Laserfiche WebLink
b. All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved <br />erosion control/storm water quality measures are in place, subject to the <br />approval of City Engineer/Chief Building Official. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br />C. Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters <br />that could contribute to storm water runoff pollution. <br />d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom -sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked -on mud and dirt from these areas before sweeping. <br />e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to retain <br />any debris or dirt flowing in the storm drain system. Maintain and/or <br />replace filter materials to ensure effectiveness and to prevent street <br />flooding. <br />f. Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the <br />site that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br />g. Never clean machinery, equipment, tools, brushes, or rinse containers into <br />a street, gutter, or storm drain. <br />h. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br />do not discharge wash water into street, gutters, or storm drains. <br />19 <br />